Buyer's Guide

CDU Drip Trays and Leak-Sensor Channels: Drawing the Interfaces

Define CDU drip trays, drain fittings and leak-sensor mounts with clear drawing interfaces, water-fill test conditions and OEM acceptance records.

DRAmetal Engineering Team October 9, 2026 5 min read
CDU Drip Trays and Leak-Sensor Channels: Drawing the Interfaces

A drip tray, a leak sensor and a cabinet drain perform different jobs. The tray collects liquid, the sensor detects a specified condition, and the drain provides a defined discharge path. Putting all three on one drawing does not make their interfaces self-explanatory.

For a CDU sheet metal enclosure, establish the collection area, expected installation orientation and selected sensor before releasing the basin. The fabricator needs to know which seams must retain liquid, which features remain outside the basin and how the completed part will be tested.

Define the collection area before adding a sensor bracket

Show the equipment and connections above the pan. Identify any openings through which liquid could bypass the collection surface. A tray that looks large in plan view may not cover a fitting positioned near an access-panel edge.

Specify the installed orientation and support condition. If a drainage slope is required, define it on the released drawing and explain how the installed frame establishes that slope. Do not assume the workshop bench and final floor have the same level condition.

Separate usable collection space from space occupied by supports, hoses and brackets. The system designer should establish the required collection volume; the fabricator should receive the geometry and acceptance method rather than calculate a safety margin from an unspecified leak event.

Continuous welded inside corner of a stainless catch pan
Control the liquid-retaining seams independently from cosmetic outer surfaces.

Place the sensor using its installation requirements

Obtain the sensor manufacturer’s mounting information and required sensing position. A liquid-level switch, point detector and sensing cable can require different interfaces. Avoid a universal bracket that forces the installer to drill new holes through a completed basin.

Place mounting fasteners outside the liquid-retaining area where the approved design allows it. If a penetration is necessary, define the sealing arrangement and who supplies it. Show cable strain relief, connector access and a route that does not obstruct tray removal.

Raised sensor mounting bracket above a stainless basin
The bracket, sensing position and cable route should remain accessible after cabinet assembly.

A correctly fabricated bracket confirms a mechanical interface. It does not prove alarm logic, shutdown behaviour or integration with the customer’s monitoring system. Assign the functional check separately, including who witnesses and records it.

Distinguish the three acceptance questions

ItemWhat the check can establishWhat still needs a separate decision
Basin and welded seamsRetention under the agreed fill-test conditionPerformance with another fluid, temperature or duration
Drain interfaceFit and sealing in its tested configurationSite drainage routing and backflow arrangements
Sensor supportPosition, fastening and service accessDetection threshold and control-system response
Complete fluid circuitResults of its own specified testNot established by testing the catch pan
Cabinet assemblyInstalled clearances and accessNot automatically an enclosure ingress rating

This separation avoids the ambiguous purchase-order note “leak test everything.” Name the test article and the configuration in which it is accepted. Include plugs, fittings and temporary closures if they form part of that configuration.

Write a repeatable pan test

State the test medium, fill level, support condition, duration and inspection method. Define the acceptance criterion and how any detected leakage is recorded. The project owner should select these conditions for the intended use; an arbitrary duration from another order is not an engineering standard.

Also state the production coverage. A first-article check, a batch sample and a test on every pan are different commitments. Record the identification of the tested items so a repeat order does not lose that distinction.

Stainless catch pan holding clear water on a level bench
A fill-test record needs a defined level, duration, support condition and item identity.

After testing, agree the drying, cleaning and packing condition. Open drain fittings and protruding sensor brackets may need protection during handling. Any protective cap used for transport should be distinguished from an installed sealing component.

Keep the pan serviceable in the finished cabinet

Review whether the tray can be cleaned or removed with the pump carrier installed. Check access to drain fittings and mounting screws, including the tools needed to loosen them. A removable pan is of limited value if its sensor wiring is trapped behind a permanent frame member.

The CS-118 customer case records a 24-hour full-water test without leakage and normal sensor triggering for that project. It also retains the stated 100% water-fill test coverage. Those are specific recorded results, not default promises for every tray.

For your RFQ, submit the basin drawing, sensor reference, drain details and test plan together. This gives the supplier a clear fabricated part to deliver and the system team a clear interface to validate.

Need a Custom Sheet Metal Quote?

Send us your CAD drawings — DRAmetal's initial response target is within 24 working hours. Quotation, DFM and lead-time timing depend on file completeness and engineering scope.

GET A FREE QUOTE →
DRAmetal Engineering Team

Team-authored manufacturing guidance. Scope, sources, corrections, and project-status labels follow our engineering content policy.