CDU Metalwork RFQs: Define the Cabinet, Frame and Wet-Loop Boundary

Scope CDU metalwork RFQs around cabinets, pump frames, drip trays and pipe supports, with clear OEM responsibilities, drawings and acceptance records.

DRAmetal Engineering Team October 9, 2026 5 min read
CDU Metalwork RFQs: Define the Cabinet, Frame and Wet-Loop Boundary

A CDU metalwork enquiry often begins with a cabinet model and a target cooling capacity. Neither tells a fabricator exactly what to supply. A stainless enclosure, a populated pump skid and a commissioned coolant distribution unit are different purchasing packages, even when they occupy the same outline drawing.

For a repeat OEM program, begin with the mechanical bill of materials and the interfaces that will be inspected. CDU sheet metal enclosure and frame fabrication can cover cabinet frames, pump carriers, catch pans, access panels and supports. Separately identify purchased equipment, fluid assemblies and final system tests. This makes quotations comparable and gives the pilot build a clear acceptance point.

Start with a supply matrix, not the cabinet outline

Use one row for each assembly. Assign a supplier, an installation owner and an acceptance record. If the pump is customer-supplied but the fabricator installs it, state who checks the received pump, provides its fasteners and accepts the installed position.

AssemblyMetalwork scope to defineSeparate decision to record
Cabinet and framePanels, braces, feet, doors and joiningPopulated mass and handling approval
Pump carrierTray, ribs, isolator interfaces and mounting datumsPump selection, isolator selection and alignment method
Catch panBasin, welds, drain and sensor bracketTest fluid, fill level and sensor functional test
Pipe supportsBrackets, clamps and bulkhead clearancePipe design, joint assembly and pressure testing
Controls compartmentMounting plates and cable-entry featuresElectrical assembly, control logic and system commissioning

A blank responsibility cell should remain an open engineering question rather than silently becoming the fabricator’s obligation. This is particularly important when the frame designer, cooling-system integrator and installation contractor are different businesses.

Folded cabinet rails and a bolted removable internal panel
Identify the structural frame and removable panels separately in the mechanical BOM.

Keep the wet loop distinct from its support structure

A CDU is more than a cabinet. Vertiv’s CDU overview describes coolant circulation, heat exchange and monitoring functions. Those system functions explain why an empty metal enclosure cannot carry the performance rating of a complete unit.

Mark the wetted boundary on the assembly drawing. A bracket around a pipe is not the pipe; a clearance hole is not a sealed fluid connection. Likewise, a catch-pan water-fill check does not establish the pressure integrity of pumps, valves or manifolds. If fluid hardware is included in the order, provide its own material, joining, cleanliness and acceptance requirements.

Avoid a single instruction such as “supply leak-proof CDU cabinet.” It leaves the test object unclear. Specify whether acceptance concerns the pan seams, a drain connection, a complete fluid circuit or an enclosure ingress requirement.

Release mechanical interfaces in the finished state

Include a datum scheme connecting the frame feet, pump supports, pipe supports and service openings. A supplier should know which interfaces must align after welding and finishing, not only while the panels are flat.

For coated steel parts, identify masked mounting pads, threaded features and any selected bonding surfaces. For stainless parts, state the finish and the required post-weld treatment. Mixed materials can need different finish routes; a cabinet-level finish note should not erase those distinctions.

Separate reinforced pump carrier and welded stainless catch pan
Pump supports and liquid collection parts need different acceptance records.

The released package should also show the installed hardware condition used for inspection. A hole pattern measured before a welded brace is fitted does not demonstrate the final assembly relationship. Agree whether a mating fixture, component model or trial assembly forms part of the inspection plan.

Quote service access and handling as separate conditions

A cabinet can fit every component and still be difficult to maintain. Show the pump removal envelope, tool access, disconnect positions and temporary support condition. An opening that clears a bare pump may not clear its attached fittings.

Then describe the shipping and handling state. Dry metalwork, a populated drained unit and a filled operating unit can have different masses and support conditions. Refer to the dry and filled handling guide before assigning loads to frame members or attachment points.

Accessible bolted brackets inside a lower cabinet frame
A service opening should be checked against the removal sequence, not just the assembled outline.

Close the RFQ with a repeat-order record

Send the revision-controlled drawing set, BOM, mating component references, forecast quantities, finish schedule and inspection requirements together. List unresolved items with an owner and a decision date. Request quotation assumptions in writing, especially where an equipment model or test procedure is not yet released.

For the pilot order, agree which records become the baseline for repeat batches: dimensional inspection, selected fit checks, pan testing and approved deviations. Keep final thermal, electrical and control-system acceptance attached to the responsible system team. The resulting order is a defined fabrication package that can be repeated, rather than an open-ended promise about an entire cooling system.

Need a Custom Sheet Metal Quote?

Send us your CAD drawings — DRAmetal's initial response target is within 24 working hours. Quotation, DFM and lead-time timing depend on file completeness and engineering scope.

GET A FREE QUOTE →
DRAmetal Engineering Team

Team-authored manufacturing guidance. Scope, sources, corrections, and project-status labels follow our engineering content policy.