“Passivate after fabrication” looks like a complete drawing note until two suppliers quote different routes. One proposes a citric process; the other retains nitric treatment from an existing approval. Both may offer sensible manufacturing plans, but the buyer still needs to decide what the purchase order actually permits.
For OEM stainless components, citric versus nitric passivation is a specification decision, not a contest with one universal winner. The useful comparison is the proposed process, its compatibility with the released part and the evidence required for acceptance. This guide focuses on that purchasing decision; the passivation overview covers the basic finishing context.
Begin with the part, not the acid name
Identify the alloy, drawing revision, incoming surface and completed fabrication operations. Include welded areas, machined features, fitted hardware and surfaces that must remain protected. A flat plate and a welded enclosure may share a material designation without sharing a practical finishing route.
The public scope of ASTM A967/A967M includes alternative treatments and qualitative verification practices. It does not select a treatment or acceptance criterion for every application. The purchase documents therefore need more than the standard number: they need the applicable edition and the customer-approved requirements.
Keep dimensional and surface-texture requirements separate from the chemistry selection. If a mating face needs a particular roughness, specify where and how it will be measured. Do not expect the word “passivation” to resolve that requirement automatically.

Separate fixed requirements from permitted alternatives
A buyer may have a released nitric route that cannot change without approval. Another project may allow either route once the proposed process and inspection plan have been accepted. Those are different commercial conditions, even when the finished brackets look similar.
State whether the finisher can propose an alternative, who approves it and which records must accompany the request. Include that decision in the quotation review rather than leaving it until the first batch is ready to ship. An alternative that requires a new customer review can change the release schedule without changing the cutting or forming work.
| Purchase clause | Fixed-route order | Alternative-route order |
|---|---|---|
| Process selection | Use the released route and approved revision | Submit the proposed route before production |
| Verification | Follow the specified method and sampling | Agree the method and sampling with the route |
| Surface requirements | Preserve the drawing’s limits and defined regions | Alternatives do not waive drawing requirements |
| Change authority | Obtain approval before substitution | Record the accepted option in the release |
| Nonconforming batch | Follow the agreed disposition process | Do not switch chemistry as an unrecorded repair |
This comparison is a purchasing framework, not a treatment recipe. Concentration, temperature, exposure time, rinsing and workplace controls belong in the approved finishing procedure and its governing requirements.
Review preparation and verification together
Ask the supplier to identify the condition entering passivation. Burr removal, weld cleanup, handling and intermediate machining should not disappear into a single finishing line on the quote. If electropolishing is included, show it as a separate operation with its own acceptance and dimensional considerations.
Likewise, agree the evidence used to release a lot. A process certificate, a surface test and a roughness report answer different questions. Define which are required, where the test applies and how the inspected parts are linked to the shipment. The ferroxyl report checklist explains what to review when that particular verification method is specified.

Avoid approving a method solely because another component passed it. The relevant questions are whether the method is appropriate to this alloy and configuration, whether the test locations cover the requested surfaces and whether the acceptance rule is agreed before production.
Write the change and rework clause before it is needed
The drawing may change after a batch has been finished. An added hole, local grinding operation or replacement welded feature creates a new review point. Identify who decides whether additional treatment or verification is necessary, and how the affected quantity is separated from unaffected stock.
The post-machining review guide provides a practical sequence for that decision. Do not authorize an automatic second treatment without checking the revised configuration and its other requirements. Conversely, do not reuse an earlier report without confirming that it still describes the shipped condition.
Make the RFQ easy to compare
Send both bidders the same drawing package, alloy specification, permitted process options, inspection locations, sampling basis and required records. Ask them to list exceptions explicitly. Compare the accepted scope before comparing price or lead time.

For passivated stainless steel parts, include forecast quantities and packaging requirements alongside the finish note. A complete RFQ lets the fabrication and finishing teams review one controlled manufacturing route, with clearly priced inspection and change responsibilities.
Need a Custom Sheet Metal Quote?
Send us your CAD drawings — DRAmetal's initial response target is within 24 working hours. Quotation, DFM and lead-time timing depend on file completeness and engineering scope.
GET A FREE QUOTE →