A message saying “these brackets do not fit” starts a conversation, but it is not enough to decide what to do with a delivery. The supplier needs to know the affected configuration, the requirement that was not met, the evidence and the material that must be protected from unintended use.
A nonconformance report, or NCR, provides that connection. For medical-equipment sheet metal, it should separate an observed failure to meet a requirement from an unresolved design question, and keep the material decision traceable through disposition and release.
Begin with the requirement, not an accusation
Identify the purchase order or job, part number, drawing revision and applicable requirement. Then describe the observed condition using objective evidence.
“Hole does not align with mating module” is an observation. To establish the nonconformance, also identify the approved interface, the revision of the mating reference, the inspection state and the applicable criterion. A mismatch between two uncontrolled samples may first require an engineering investigation.
Do not weaken a clear nonconformance by writing only “poor quality.” Equally, do not declare a supplier fault before checking whether the supplied part and receiving inspection used the same released requirements.
Make the evidence understandable to someone off site
Photographs can locate damage or show the inspection setup, but they do not establish every dimensional result. A measurement record should identify the feature, method, result and acceptance limit where applicable. Retain the context needed to interpret the observation.
| NCR field | Useful content | Avoid |
|---|---|---|
| Identity | Part, revision, order and lot or other agreed trace | A product nickname without configuration |
| Requirement | Drawing feature or specification reference | An undefined expectation of “precision” |
| Observation | Measured or clearly described condition | A guessed cause stated as fact |
| Evidence | Original photographs, readings and method context | A cropped image with no location or scale context |
| Scope | Confirmed affected parts and potentially affected population | Treating inspected failures as the full suspect population |
| Immediate control | Hold location, status and responsible contact | Leaving suspect stock in released bins |
| Disposition and closure | Authorized action, verification and release record | “Fixed” with no evidence or approver |
For example, a hypothetical report could identify feature C1 on bracket MB-01 revision A and record that it failed the specified fixture check. Those identifiers are illustrative, not a real DRAmetal complaint or inspection result. The actual report would need its actual criteria and evidence.
Contain the suspect population while scope is established
Separate confirmed defective items from the broader population that may share the cause. Relevant boundaries could include material identity, production setup, finishing batch, shipment or a configuration change. Use available evidence to establish the boundary.
The containment record should state what is held, where it is, who controls its status and whether related work or stock needs review. If parts are already at another location, coordinate the information through the agreed customer process.
Color-coded bins can support segregation, but color alone is not traceability. Preserve the part and lot identity, quantity status and authorized handling instructions. Do not release material simply because it has been moved into a different container.
Keep disposition choices distinct
A disposition answers what will happen to the affected material. It is different from deciding why the issue occurred.
Rework intended to restore full conformity needs an authorized instruction and subsequent verification. A proposed repair or use-as-is decision may require additional assessment and explicit authorization under the applicable quality agreement. Return or scrap decisions also need controlled identity and records.
The supplier should not enlarge a hole, remove a locating feature or alter a finish requirement merely because the changed part can be assembled. If the proposal changes the design requirement, route it to the authorized engineering and quality parties. A concession for a specific lot is not automatically a permanent drawing change.
Reinspect the effects of the action
After authorized rework, verify the relevant requirements and consider what else the operation could have affected. Altering a mounting slot may affect its edge condition or finish. Removing and replacing hardware may affect the surrounding sheet.
Record the rework instruction, affected parts, verification results and release authority. Preserve the original NCR and observation rather than replacing them with a clean report that hides the history.
If evidence remains incomplete, record the open condition. Administrative closure should follow the actual material decision, not create the appearance that the parts were accepted.
Decide whether a supplier corrective action is also needed
An NCR controls a particular nonconformance and its affected material. A supplier corrective-action request investigates and addresses causes when escalation is warranted. Repeated issues, significant consequences or evidence of a wider process weakness can justify that additional work under the agreed process.
FDA’s QMSR risk and design presentation identifies control of nonconforming product and improvement as separate areas within the referenced quality framework. This article provides a practical supplier-record example, not a complete regulatory procedure.
See the supplier corrective-action guide for cause verification and effectiveness follow-up. Do not close a systemic investigation merely because replacement parts have shipped.
Close the loop with the next order
If the accepted response changes a work instruction, fixture, inspection checkpoint or drawing, ensure the revised requirement reaches the next order. Keep temporary deviations distinct from permanent changes and record their effective scope.
Receiving also needs to know which replacements complete the original delivery and which parts remain held or rejected. The incoming kit inspection guide covers that release interface.
For medical sheet-metal parts and kits, agree the discrepancy contact, required evidence, disposition authority and record expectations before production. DRAmetal can review those requirements as part of the OEM fabrication scope. A clear NCR supports a defensible decision without turning uncertainty into an unsupported blame statement.