A cable gland can fit its hole perfectly and still be impossible to install on the motor. The obstruction may be a cooling fin outside the box, a terminal support inside it or the tool needed to tighten a locknut. Hole diameter alone cannot reveal these conflicts because they occur around the installed component, not at the cut edge.
For custom motor terminal-box metalwork, treat each cable entry as a small assembly interface. Release its orientation, selected hardware, cable route and installation sequence together. This approach is particularly useful when one motor program includes several mounting positions or several cable sizes using a related shell.
Define the viewing direction before naming a side
Left entry and right entry are ambiguous descriptions unless the drawing states the viewing direction. Use a motor reference such as the shaft end or an identified frame datum. Show the terminal box in its installed position and identify which wall carries each cable entry. Include the location of nearby motor features that constrain access.
Do not assume a box can be rotated merely because its mounting holes are symmetric. Internal motor leads, flange details and cable approaches may restrict the available positions. The orientation matrix guide separates a common hole pattern from actual configuration compatibility.
For an adapter-mounted box, include both adapter orientation and box orientation in the configuration code. A purchasing note that changes only the box suffix may otherwise leave the assembler with the correct entry wall facing an incorrect adapter passage. The release needs enough information to reconstruct the complete path.

Work from the selected gland, not a generic symbol
Provide the actual gland specification, thread form, mounting arrangement and applicable installation instructions. Identify whether it threads into a boss, passes through a clearance hole with a locknut or mounts on a removable entry plate. These arrangements have different wall-thickness and access implications.
The gland outline should include the assembled body, seal components and tool-contact features. Also identify any blanking plugs for unused entries. A hole that is convenient for the first cable option may not suit a later component with a larger body or a different nut. Changes to purchased hardware should trigger an interface review, not just a BOM substitution.
Review any installation torque using the selected component manufacturer’s instructions and the approved assembly procedure. Do not borrow a torque value from another project or infer it from thread diameter alone. The metalwork drawing should communicate the supporting geometry and surface condition required for that approved installation.
Check both sides of the wall
Outside the box, review clearance to the motor frame, adjacent piping, support brackets and nearby connectors. Inside, review the locknut, wrench approach, terminal supports and any installed barriers. The clear space needed to tighten a nut may be larger than the space occupied by the nut after assembly.
Include the order in which components are installed. A gland that can be fitted before the terminal board may not be replaceable with the board in service position. Decide whether that sequence is acceptable for the equipment’s maintenance plan. If removal of another component is required, record it explicitly rather than describing the gland as generally accessible.
| Review zone | Required envelope | Common missed dependency |
|---|---|---|
| Outer wall | Gland body and installation tool | Motor fin, pipe or nearby connector |
| Inner wall | Locknut, washer and tool movement | Board support or internal barrier |
| Cable route | Approved bend and termination layout | Cover fastener projection |
| Service path | Withdrawal and replacement sequence | Board removal required first |
| Unused opening | Selected blanking arrangement | Different sealing or fastening interface |
Follow the cable to its final termination
Do not stop the review where the cable crosses the metal wall. Show the approved route to the terminal, including bend requirements and the space occupied by the terminated end. Cable selection, conductor arrangement and electrical separation are electrical-design inputs. The enclosure supplier can check the resulting mechanical envelope but should not invent those requirements.
Use the populated terminal arrangement when reviewing the route. A board outline without links, lugs and fastening hardware can overstate the free space. The cover-clearance checklist is useful where a cable path approaches lid screws or the underside of the cover.

Decide whether a removable entry plate earns its extra interface
A separate plate can accommodate different entry layouts without changing the main shell. It also introduces another joint, fixing pattern and surface relationship. Specify its orientation, retention, seal if required and the condition in which it is inspected. An interchangeable plate is useful only when the common interface remains controlled.
Consider replacement access to the plate itself. If its screws are hidden behind the mounted motor or an adjacent structure, the apparent flexibility may disappear after installation. Review the plate’s complete removal path with all surrounding equipment present, not only in a standalone enclosure model.

Validate the specific arrangement and retain its identity
WEG’s W22 brochure treats cable-entry protection and motor configuration as specific requirements. Apply that principle to the RFQ: a convenient fabricated opening does not establish the rating of the finished motor assembly. Agree any required environmental or electrical verification separately.
At first article, record the motor or fixture reference, entry hardware identities, board configuration and actual installation sequence. Distinguish dimensional findings from service observations and formal tests. When an opening moves, update the coordinate drawing, variant code and related cable layout together so the improvement survives into repeat production.
The motor terminal-box customer project records cable-entry fit, plug corrections and a cable-exit interference review. Read those findings alongside their inspection scope before carrying a similar interface into another motor variant.