Adding more holes is not always the answer to residual water in a stainless instrument tray. A low corner, a closed overlap or a support foot positioned against an opening may interrupt the intended drainage path. The relevant geometry includes the tray in its actual support position, with the specified dividers and locators installed or removed.

For custom medical instrument trays, drainage should therefore be reviewed as an assembly feature. The fabricator can control hole locations, formed geometry, joints and supports. The OEM still needs to evaluate the finished arrangement under its intended processing conditions.

Start with the supported orientation

Show how the tray rests during the operation being evaluated. A flat bench, a rack and another tray can contact different areas of the base. A drainage opening has little value if a supporting surface blocks it in the relevant orientation.

Identify whether the tray is expected to remain level, sit at a defined angle or pass through multiple positions. Avoid drawing an arbitrary slope into the part before the owner of the processing arrangement has confirmed the support condition. The drainage review needs a specific assembly state, not a general claim that water can leave the tray.

FeatureQuestion for the design reviewDrawing or inspection input
Base perforationsAre openings clear in the supported position?Hole pattern and support contacts
Formed cornersWhere can liquid remain at the transition?Corner section and finished geometry
Welded jointsAre there specified continuous seams or overlaps?Joint detail and finish acceptance
Dividers and padsWhich parts remain fitted during review?Assembly configuration
FeetDo they provide clearance without blocking outlets?Height, position and attachment
Functional checkUnder what conditions is drainage assessed?Orientation, method and acceptance criteria

Treat the finished corner as a defined feature

A radius note describes only part of a welded corner. The transition between the base and walls, the seam termination and any local surface blending also affect the finished shape. A large nominal radius can still contain an abrupt step or an inaccessible overlap if the joint detail is unresolved.

Specify the finished corner that is required, including the joint construction and any areas where an overlap is not acceptable. Agree how that feature will be checked. Visual access may be sufficient for one requirement, while a contour or dimensional check may be needed for another.

Close view of a rounded welded inside corner on a perforated stainless tray
Review the finished transition and seam, not only the nominal corner radius.

In the medical instrument tray customer project, the design used R ≥8 mm corners with continuous welding as part of its response to difficult corner access. That is a project-specific design choice, not a universal minimum radius for every medical tray.

Coordinate hole pattern and edge treatment

Perforations close to a bend or joint need particular attention during fabrication review. The pattern must leave enough material for the specified forming and joining route while maintaining the intended openings in the finished assembly. Do not shift holes informally on the shop floor without updating the approved design.

Hole edges also need acceptance criteria. A drawing may call for a burr-height limit, a finished edge condition and a visual check, but these are not interchangeable observations. Specify which requirements are measured and which are assessed by an agreed inspection method.

Low-angle view of a stainless tray with perforated walls and support feet
Feet and their attachments should be checked against the intended drainage openings.

The perforated sheet and wire base comparison covers the earlier construction decision. Once the construction is selected, inspection should follow the actual finished geometry rather than assuming that an open-looking surface performs as required.

Check the removable parts in the relevant state

Divider clips, silicone pads and locating features can create contact zones that are absent from a bare tray drawing. Review the assembled and disassembled conditions separately. Specify which configuration applies to a drainage observation, dimensional check or processing evaluation.

FDA’s discussion of factors affecting reprocessing highlights the importance of device features and access. Accessible geometry supports a design review; it does not replace validation of the intended cleaning or sterilization process.

Stainless tray body beside a removable partition and silicone locator mat
Record the supported orientation and fitted components when evaluating the tray.

Put the evaluation method in the RFQ

If drainage is a required acceptance characteristic, define how it will be evaluated. The method should identify the tray configuration, support arrangement, observation period and permitted residual condition. Leave unresolved values for the responsible engineering team to approve rather than filling them with a supplier’s assumption.

Likewise, do not translate a material-durability observation into a sterility claim. A tray can retain its shape through the specified exposure while the complete instrument load still requires a separate validated process. In the RFQ, keep fabrication acceptance, component durability and processing performance as distinct work items.

Combine the released corner and perforation details with the tray first-article checklist and the component RFQ package. The resulting inspection plan should tell the supplier what to make, how to present it and which finished features the OEM will accept.

Need a Custom Sheet Metal Quote?

Send us your CAD drawings — DRAmetal's initial response target is within 24 working hours. Quotation, DFM and lead-time timing depend on file completeness and engineering scope.

GET A FREE QUOTE →
DRAmetal Engineering Team

Team-authored manufacturing guidance. Scope, sources, corrections, and project-status labels follow our engineering content policy.