A welded tray leak-test requirement should explain what was tested and what counted as a failure. “Pressure tested” alone leaves too much undecided: the assembly boundary, fixture seals, hold condition, sample coverage and even the purpose of the test.
When specifying custom stainless steel drip trays, separate a fabrication leak check from a pressure rating or an equipment-level containment claim. An open tray temporarily closed by a fixture is not automatically a pressure vessel intended for service.
Begin with the welded boundary
Identify all joints that can release collected liquid. On a fabricated tray these may include corner seams, a drain boss and attachments penetrating the liquid boundary. A local check at one weld does not necessarily cover the rest of the assembly.
The drawing should distinguish continuous liquid-boundary welds from structural attachments outside that boundary. Give the inspector a clear connection between the drawing revision, the welded assembly and the inspection record. If a fitting is bought in, identify whether its seal is part of the supplied assembly or completed later by the OEM.

Select the method through a qualified test plan
A liquid hold check and a gas-based leak check do not answer exactly the same question. Method selection depends on the design, leak sensitivity, fixture, cleanliness requirements and hazards. The supplier and OEM should agree the method rather than substitute one merely because the equipment is available.
Pressure testing introduces stored energy. The UK HSE’s pressure-testing guidance addresses the need for a controlled safe system of work. Fixture design, restraint, isolation and protection belong to competent test personnel. A blog description or a customer’s previous pressure value is not a procedure for constructing or operating a fixture.
Separate fixture leakage from part leakage
An open tray needs a defined temporary boundary if the selected test requires sealing its opening. That boundary can create leak paths unrelated to the fabricated part. If a cover seal leaks, the test cannot simply be recorded as a tray weld failure.
Conversely, correcting a fixture leak is not evidence that every tray joint passes. The record needs a clear disposition: invalid setup, retest after fixture correction, part failure, repair or accepted result. This distinction prevents repeat tests from losing their traceability.
| Question | Required definition | Common ambiguity |
|---|---|---|
| What is enclosed? | Tray, drain and specified fixture boundary | Local weld versus complete tray |
| What is observed? | Method-specific acceptance criterion | Undefined phrase “leak-free” |
| Which pieces? | Trial, production or repaired sample set | Sample result presented as full inspection |
| What happens after failure? | Containment, repair and retest rules | Unrecorded repeated testing |
| What is supplied? | Inspection record and agreed traceability | Test pressure mistaken for a service rating |

Keep the project result attached to its sample
The CS-121 laboratory drip tray case used a dedicated sealed-cover fixture to test the complete tray, including its welded corners and drain connection. The recorded condition was 0.2 MPa for 30 seconds, with immersion observation and no bubbles recorded for 50 sampled trays from a 200-piece trial batch.
The cover’s silicone sealing interface was distinguished from tray leakage. These are reported project conditions, not instructions to replicate the test and not a working-pressure specification. The dimensional and residual-liquid checks used different sample groups, so their coverage should not be merged with the fifty-piece leak sample.
Tie finishing and repair to the inspection sequence
Agree the condition in which a tray is tested. If later work can affect a liquid-boundary weld or connection, review whether another check is needed. A weld repair should retain its identity through grinding, cleaning and the agreed retest.
Surface appearance and leak acceptance also remain separate. A smooth-looking corner does not replace the defined leak check. Equally, passing a leak check does not prove that the finish, internal radius or cleaning access meets the drawing. Include those requirements in their own inspection fields.

Ask for a usable acceptance record
Request a record that identifies the drawing revision, batch, sample quantity, method and accepted observation. Where the customer needs serial-level traceability or repair history, specify it before quotation so the supplier can plan the recording task.
For procurement, the most useful output is a bounded statement that can be checked against the purchase order. Combine this leak-test scope with the RFQ inputs and the separate residual-liquid acceptance conditions to avoid paying for a test that does not address the equipment’s actual requirement.