A pre-punched entry saves work at the equipment assembly stage only when its location, finished size and installation sequence are correct. An opening that clears a cable may still reject the connector fitted to that cable. A bushing may fit an unfinished sample but not the coated production part. Moving the hole at the machine can then affect a cover, support or divider that was already approved.
For OEM custom sheet metal wireways, treat each entry as an interface with a destination and a mating component. Release the opening after the harness route is understood, and use the first article to check the complete insertion and routing sequence rather than just a hole diameter.
Distinguish an open entry from a knockout
An already-open hole, a retained knockout and a removable entry plate serve different purchasing needs. State which form is required at delivery. Do not use “pre-punched” as shorthand for all three. If a knockout is specified, define its intended hardware and removal requirements; if a hole is open, identify the protection or blanking component that completes the assembly.
Hammond offers its CWG wireway sections with or without concentric knockouts. That manufacturer-specific option illustrates why the delivery condition belongs in the purchase description. It does not establish the geometry, rating or compatibility of a custom opening.
A fixed equipment route often benefits from a controlled hole pattern. A machine family with several cable configurations may instead need separate variants or a replaceable entry component. Choose based on the real variant plan, not on an assumption that unused openings are harmless. Any blanking requirement should be part of the released assembly.

Locate entries from the installed assembly
Reference the wireway’s mounting datum and installation orientation when positioning entry centers. Include the destination on the machine side. An entry that is correctly positioned relative to the blank edge can still miss the mating equipment if a bend or assembly offset changes the installed relationship.
Mark the face and viewing direction clearly. Left- and right-handed runs can share similar geometry but require opposite entry locations. Give the variants distinct identifiers and confirm how parts will be identified without exposing customer information. A mirrored CAD model should not silently inherit the original hole schedule.
Check nearby bends, seams, cover returns, mounting bolts and internal dividers. These features may limit the opening location or interfere with the locking components inside the wireway. Coordinate the entry after the complete folded assembly is reviewed, not only on its flat pattern.
Use the largest object that must pass through
Obtain the cable or harness supplier’s actual dimensional information. For a preterminated harness, the insertion envelope includes its connector, latches, strain relief and any protective sleeve. It may also depend on the angle at which the connector can approach the opening. Cable outside diameter alone does not define that path.
Separate insertion space from the final routing space. A connector might pass through an opening but be unable to turn inside the trough. Conversely, a harness that can be laid into a removable-cover wireway may not need its connector passed through every section. Specify the assembly sequence before increasing holes to accommodate an unnecessary pull-through operation.

The electrical designer should provide required bend radii, separation and routing constraints using the selected cable data. The metalwork supplier can review whether that envelope is manufacturable and unobstructed. It should not invent a universal bend-radius allowance or infer an electrical compliance result from a successful mechanical trial.
| Entry schedule field | OEM information to release | First-article observation |
|---|---|---|
| Entry identity | Face, orientation, variant and destination | Correct entry on the correct assembly |
| Position | Datums and finished location tolerance | Measured location in the defined state |
| Opening | Shape, size, corner geometry and delivery condition | Finished geometry and edge condition |
| Mating component | Bushing, gland, connector or blanking part reference | Seating, retention and internal clearance |
| Harness | Connector envelope and routing constraints | Insertion path and final layout |
| Assembly sequence | Lay-in, pull-through or removable-plate sequence | Fit without unapproved disassembly or force |
| Acceptance scope | Samples, method and required records | Traceable results for the inspected configuration |
Specify the finished edge and mating hardware
Match the entry geometry and sheet thickness to the selected component’s current data sheet. Include the effect of finishing where it changes the fit. A nominal hole size is not enough if the attachment depends on an allowed panel-thickness range, anti-rotation feature or locking nut clearance.
Describe burr removal and the required condition on both faces. Identify whether a bushing or other protection is supplied fitted, supplied loose or installed by the OEM. Do not assume an edge-protection bushing also provides strain relief or an environmental seal; those functions must be supported by the selected component and assembled design.
For transitions to an open cable tray, coordinate the cable’s path across the boundary. The tray support and the wireway entry should not pull the harness against the opening edge. Keep cable support requirements separate from the hole’s dimensional acceptance.
Use a first-article sequence that exposes interference
First check the finished metalwork against the drawing. Then fit the selected hardware and representative harness in the intended order. Close the cover and confirm that internal screws, dividers and hardware do not intrude into the approved routing envelope. Where removal is required for maintenance, perform that sequence as well.

Record the wireway revision, finish, hardware references and harness revision. Note any substitution used in the trial and what it represents. A dimensional template can demonstrate a defined clearance, but it does not reproduce every feature or stiffness characteristic of the actual harness. The approval owner should accept that limitation explicitly.
The metal-wireway customer project provides related assembly context. For a new RFQ, include the entry schedule, harness envelope, hardware data and inspection plan. This turns a set of holes into a controlled equipment interface, with electrical and environmental acceptance addressed through the appropriate project verification rather than assumed from appearance.