03 / Quality Control

Quality Control & Inspection

Internal drawing, revision and inspection controls for build-to-print manufacturing. The inspection and documentation scope is agreed before production.

View inspection equipment & ranges → View DRAmetal certifications → View cooperating supplier certificate → Review feature-level inspection results →

REV
Drawing Control
QC
Agreed Inspection
SAMPLE
RFQ Sampling Plan
DOC
Defined Record Package

DRAmetal Certifications & Compliance Documentation

Quality Credentials

Company certificate holder: Shenzhen Shixin Metal Products Co., Ltd., operating as DRAmetal. Company certificates are available privately for supplier qualification; the cooperating supplier's document is presented separately below.

Request Certification Documents →

Start your qualification file with the supplier evaluation pack: capabilities, evidence and order conditions, available as a five-page PDF.

Management-System Certifications

🛡️

ISO 9001

DRAmetal is ISO 9001 certified. Certification documents are available on request for supplier qualification.

✈️

AS9100D

DRAmetal is AS9100D certified. Aerospace inspection, first-article and traceability records follow the agreed project requirements.

🏥

ISO 13485

DRAmetal is ISO 13485 certified. Medical component documentation is matched to the agreed project scope.

🚗

IATF 16949

DRAmetal is IATF 16949 certified. PPAP deliverables are agreed against your customer-specific requirements.

Certificate Summary & Qualification Review

Holder and contracting entity
Shenzhen Shixin Metal Products Co., Ltd.; DRAmetal is the international-facing brand.
Document access
Request company certification documents through sales@drametal.com. Include the required standard and the parts, processes and manufacturing location you need to qualify.
Check against the certificate
Review the certificate number, standard edition, certified activities and sites, issuing certification body, issue and expiry dates, and current status. Match that scope to the work being ordered.
Verification route
Use the issuer's verification service or contact the issuer using the certificate details. For accredited certifications listed there, IAF CertSearch (new tab) provides an additional check; this link is not a verification result for DRAmetal.

Management-system certification and product acceptance are separate. An enclosure's IP rating, cleanroom suitability or equipment approval requires the applicable configuration-specific evidence.

Material & Product-Specific Documentation

♻️

RoHS / REACH

RoHS and REACH documentation is available on request for applicable materials and finishes. Confirm the required declarations in your RFQ.

⚡

UL / Product Approval

UL certification documentation is available on request for applicable products and components. Confirm the model and listing scope for your project.

Cooperating Supplier Certificate

Supplier-Held
English page of cooperating supplier Dongguan Korsun's quality management system certificate, number 46024Q2703R0S
English-page preview. The original PDF includes both Chinese and English pages.

Dongguan Korsun

A cooperating supplier of DRAmetal. This certificate is displayed with the holder's permission.

Certificate holder
东莞市科尚机电技术有限公司
Standard
GB/T 19001-2016 / ISO 9001:2015
Certificate number
46024Q2703R0S
Supplier scope
Production of chassis shell and hardware accessories (excluding qualification licensing requirements).
Issuer
Shenzhen Huazhi Certification Service Co., Ltd.
Printed validity
–

This authorized certificate is held by Dongguan Korsun and covers the production scope stated above. DRAmetal's own management-system certificates and medical-device certification support documentation are available separately on request. The production supplier and project-specific quality records are confirmed during RFQ review.

2 pages · PDF · 795 KB. Continued validity is subject to the issuer's surveillance requirements.

Our 6-Stage QC Process

End-to-End
01

Incoming Material Inspection (IQC)

Check material identity, thickness and condition against the order and agreed incoming inspection plan. Material composition or PMI testing is arranged through an external testing source when specified, with the result linked to the material lot.

  • Material records, including EN 10204 3.1 when specified
  • External material-composition or PMI report when required
  • Surface and material-identity checks to the agreed plan
  • Thickness sampling and measurement points defined by the plan
02

First Article Inspection (FAI)

First-article scope, characteristics, method and approval gate are defined by the purchase requirements. An AS9102-format report is prepared only when specified, feasible and included in the quotation.

  • Characteristics and sampling defined by the buyer
  • Calibrated method selected for the released geometry
  • Customer report template reviewed before quotation
  • Production release gate agreed in writing
03

In-Process Inspection (IPQC)

In-process characteristics, sampling frequency, responsible operator and any Statistical Process Control method follow the accepted project control plan.

  • Project-defined characteristics and sampling
  • Calibrated method appropriate to the tolerance
  • Defined reaction plan for nonconforming results
  • Capability study only when specified and quoted
04

Final Inspection (FQC)

Critical features, measurement method, all-unit or sampled inspection, and acceptance criteria are defined by the accepted project quality plan.

  • Buyer-defined inspection of critical features
  • Project-defined sampling for general dimensions
  • Surface roughness verification
  • Visual inspection for defects, scratches
05

Outgoing Inspection (OQC)

Review the shipment against the agreed outgoing inspection plan, including any required independent recheck of critical features. Confirm that part identification, quantities and the documentation package match the order before release.

  • Independent verification when required by the quality plan
  • Package count verification
  • Documentation review
  • Release approval by the designated responsible person

Review inspection release and shipment handover responsibilities →

06

Post-Delivery Support

Report a suspected nonconformance with the order reference and inspection evidence. Containment, review, disposition, corrective action and record retention follow the accepted quotation, purchase order and agreed quality clauses.

  • Order-specific notification and disposition terms
  • Record-retention period defined by agreement
  • Root-cause review when required by the quality clause
  • Corrective-action format defined by the customer

What to record when an issue is found at receipt →

Supplier corrective-action and effectiveness checks →

OEM supplier reference

In-House Inspection Equipment & External Test Support

The equipment below supports dimensional, surface and mechanical checks. Specialist environmental, material and nondestructive tests are coordinated with external providers when required by the project.

Measurement range is not measurement accuracy or uncertainty. Part access, fixtures, selected test method and current calibration status are reviewed for the inspection plan. External laboratory capability is not represented as in-house equipment.

On smaller screens, scroll the table horizontally to view all columns.

Equipment, Working Range & Responsibility
Equipment / testModel / sourceRange / scopeResponsibilityCalibration / qualificationReport / method scope
Coordinate measuring machineHexagon GLOBAL 05.05.05500 × 500 × 500 mmIn-houseCurrent annual calibrationRedacted dimensional reports; fixture and probe access reviewed for the part.
Vision measuring systemWanhao VMS-3020300 × 200 mmIn-houseCurrent annual calibrationFeature visibility and measurement method are confirmed for the component.
Surface roughness testerMitutoyo SJ-210Ra 0.01–40 μm working rangeIn-houseCurrent annual calibrationReported roughness includes the specified sampling / evaluation conditions.
Coating thickness gaugeTT2600–1500 μmIn-houseCurrent annual calibrationCoating and substrate compatibility are checked before selecting the measurement method.
Digital force gaugeHF-5000–500 NIn-houseCurrent annual calibrationRetention tests use the agreed fixture, force direction and acceptance criteria.
Digital torque testingModel not published0–10 N·m / 0–50 N·mIn-houseCurrent annual calibrationThe selected range and test arrangement follow the joint requirement.
Calipers / micrometersModel not published0–300 mmIn-houseCurrent annual calibrationThe appropriate instrument is selected for each feature; no measurement accuracy is inferred from range.
Height measurement / inspection surfaceModel not publishedHeight: 0–500 mm; grade 0 surface plateIn-houseCurrent annual calibrationDatum setup and accessible surfaces determine measurement suitability.
Salt spray testingExternal testing providerMethod and exposure agreed by projectExternal partnerProvider records reviewed for the testThird-party report, with confidential information removed where publication is authorized.
Vibration / drop testingExternal laboratoryConfiguration and test profile agreed by projectExternal laboratoryProvider records reviewed for the testProject reports; laboratory equipment is not presented as DRAmetal-owned.
Material composition / spectroscopyExternal laboratoryMaterial and analytical method agreed by projectExternal laboratoryProvider records reviewed for the testRedacted material reports when included in the agreed inspection package.
X-ray / nondestructive testingExternal laboratoryCritical parts when requiredExternal laboratoryMethod and personnel qualification reviewedPart-specific scope, acceptance criteria and reporting defined before testing.

Capability reference reviewed . Confirm the applicable scope with the drawing and inspection requirements.

Plan the Measurement Around the Feature

Geometry, first-article dimensions and coated surfaces need different measurement setups and records.

Coordinate measurement setup with a fixture-held sheet-metal bracket and probe

CMM Geometry Checks

Agree the datums, inspected features, fixturing and sample quantity before measuring the part.

Sheet-metal parts, height gauge and caliper arranged on an inspection surface

First-Article Dimensions

Identify the drawing revision and key dimensions, then record the actual readings against their specified limits.

Coating thickness probe positioned on a powder-coated enclosure panel

Coating Thickness Checks

Define the coating zones, measurement locations and acceptance limits. Keep individual readings separate from their averages.

Customer Project Results

Review the Result and Its Inspection Coverage

Compare the finished feature, recorded measurement and sample scope in an actual project before defining the acceptance plan for your parts.

Hole location & installed hardware

Recorded hole-group position
0.04–0.07 mm
M3 sample pull-out force
200–260 N

Inspection coverage: Hole groups: first-article CMM plus three pieces per batch. M3 pull-out: five destructive samples per batch. These are separate inspection populations.

For your RFQ: Release the locating datums, plate thickness and fastener reference together; specify the test method and sample quantity.

Read Equipment Mounting Plate: Hole-Group Control and Repeatable Location →

Finished stainless surfaces

Recorded surface roughness
Ra 0.25–0.38 μm
Sampled free-iron checks
All passed

Inspection coverage: Roughness: five points per piece, three pieces per batch. Free-iron checks: three locations on each of three pieces per batch. Appearance was inspected on every piece.

For your RFQ: Name the finished surface zones, roughness measurement conditions and chemical-test coverage rather than specifying appearance alone.

Read Medical Stainless Parts: Surface Acceptance and Batch Traceability →

Coated cover fit & drawing corrections

Recorded splice gaps
0.3–0.6 mm
Cover clearance after coating
0.2–0.3 mm

Inspection coverage: Dimensions: six sampled pieces. Cover and splice fit: trial-assembly observations. Eight cable entries were checked; two corrected opening sizes still require drawing updates.

For your RFQ: Carry corrected entry sizes and the accepted coated-fit condition into the next drawing release; do not assume the follow-up is already closed.

Read Metal Wireway: Cover Fit, Splice Alignment and Entry Corrections →

These published case summaries describe their own configurations and checks. Define the drawing revision, acceptance limits, sample quantity and required records for each new order.

Redacted Inspection Summaries

Explore recorded measurements from individual mining-bracket and energy-storage enclosure projects. Each summary retains its measurement date, acceptance criteria and inspection sample scope.

Mounting Bracket: CMM Geometry

Project: Mining control-cabinet mounting bracket

Geometric and dimensional results for one first-article bracket, including mounting-hole position and datum-related checks.

Coverage: One first article, full-dimensional inspection. Equipment: in-house Hexagon Global S 07.10.07. No batch pass rate is inferred.

Inspection date:

View inspection summary (PDF, new tab)

Enclosure Frame: First-Article Checks

Project: Energy-storage enclosure upper frame

Seventeen recorded first-article checks covering dimensions, fit, installed hardware and appearance.

Coverage: One first article from an order of 500 pieces. The recorded checks apply to that sample, not to all 500 pieces.

Inspection date:

View inspection summary (PDF, new tab)

Coated Panel: Thickness Readings

Project: Energy-storage enclosure side panel

Mean coating thickness of 82.8 μm; location means range from 66.0 to 95.0 μm. Individual readings are listed separately.

Coverage: One panel, ten measurement locations, three readings per location. The 30 individual readings range from 65 to 96 μm.

Inspection date:

View inspection summary (PDF, new tab)

Feature-Level Inspection Results

Review these independently presented, anonymized project records when defining a new inspection plan. Each result retains its own sample coverage and acceptance conditions.

Door Sealing & Clean-Pack Inspection

Door-seal test configuration and recorded results: one door assembly mounted on a 600 × 600 × 600 mm sealed test chamber. This record is not a rating for the complete production cabinet.

316L housing cleaning and packaging checks: five inspected pieces, with individual roughness readings and two PE bag layers plus an aluminum-foil bag. These checks do not establish a cleanroom classification.

Define the Inspection Plan for Your Part

Drawing-Based Acceptance

Geometry & Measurement Setup

  • Use the released drawing, datums and feature identifiers
  • Check probe or optical access and the fixture arrangement
  • Match measurement uncertainty and method to the tolerance
  • Define whether the check is before or after forming and finishing

Coverage & Recorded Results

  • Identify first-article, sampled and all-unit checks separately
  • Agree lot definition, sample quantity and acceptance criteria
  • State roughness parameters, cutoff and measurement direction
  • Review the required report format and external-test scope before order

Supplier Qualification Records

  • Redacted equipment and inspection records support supplier review
  • Calibration certificate identifiers are not published
  • Customer drawing and part numbers are removed from public examples
  • Factory layouts and customer-identifying details remain private

RFQ Documentation Checklist

Project-Defined
Baseline

Commercial Records

Confirm before order

  • Material or distributor records when available
  • Drawing-defined dimensional report
  • Supplier declaration with agreed scope
  • Packout and identification records
  • Agreed export documents

For commercial, industrial, consumer products

Buyer-Defined

Aerospace Records

Aerospace quality documentation

  • AS9102-format first article when quoted
  • Material-lot linkage when records are available
  • Buyer-approved external process records
  • Supplier declarations supported by source data
  • Record retention and change control by contract

The buyer retains supplier approval and program compliance.

Component Scope

Medical-Program Records

Medical quality documentation

  • Component drawing and revision records
  • Project-defined process evidence
  • Surface-finish verification when specified
  • Packaging route and responsible party
  • OEM-owned regulatory and risk documentation

Medical device certification support and related documentation are available on request. Confirm the target market, device scope and required deliverables during RFQ review.

Need a Specific Quality Standard?

Whether you need basic CoC documentation or full PPAP Level 3 with FMEA, our QA team can scope the right package for your industry. Contact us for a tailored quality plan.