A laboratory equipment OEM needed a better way to collect occasional leakage beneath tubing connections inside an analyzer. The existing tray could catch liquid, but its corner geometry, drain position and fixed grate made drainage and cleaning unnecessarily difficult.
DRAmetal fabricated a revised stainless tray assembly with rounded internal transitions, a drain at the low point and a removable grate. In the project’s ten-piece residual-liquid sample, measured retention ranged from 0.8–1.2 mL, with 1.2 mL as the maximum, against a drawing requirement of ≤5 mL. Dimensional inspection and whole-tray leak checking were recorded separately.
Why the original arrangement needed to change
The original tray used square corner joints that left difficult-to-clean liquid-retaining areas. Its drain was offset to one side, so tilting the tray did not remove all of the retained liquid. The grate was welded in place, preventing it from being taken out for cleaning.
These were linked assembly issues. Changing only the outlet would not improve access beneath a fixed grate. Making the grate removable would not, by itself, resolve the corner geometry or the low-point relationship. The redesign therefore addressed the tray body, drain and grate together.
The assembly remained a component within the customer’s laboratory equipment. The customer equipment model and site layout are not disclosed.
Material and fabrication route
The body used 1.5 mm SUS304 stainless steel; the removable grate used 1.0 mm SUS304. The manufacturing route was laser cutting, CNC bending, continuous argon-arc welding of the corners, weld grinding and polishing, TIG welding of the drain outlet, gas leak checking and brushed surface finishing.
The revised internal corners used R30 transitions. The drain moved to the low point, with 3° drainage geometry, and the grate changed to a removable arrangement retained by clips at the tray frame. Weld finishing was specified to Ra ≤0.8 μm.
The grate’s purpose was to support sample bottles while preserving access to the tray below. Single-person removal for cleaning was reported for the finished arrangement. No numerical grate load rating was supplied for this case, so the project is not presented as a load-capacity qualification.
Mounting and drain-interface inspection
The mounting-hole and drain dimensions were evaluated on the trial assembly. Recorded mounting holes were Ø5.2 mm, with positional deviations of 0.1–0.3 mm against the specified ±0.5 mm requirement. The DN15 internal-thread connection was clear, and first-article trial assembly aligned with the customer’s equipment piping interface.
The trial batch contained 200 pieces, but it was not a 200-piece full-dimensional inspection. The first 20 pieces received full-dimensional inspection using a coordinate measuring machine and calipers. The remaining 180 pieces followed AQL sampling, with five pieces per batch. No numerical AQL acceptance level is claimed here.
The dimensional inspection record was dated September 20, 2026. This distinction between first-article coverage and subsequent sampling is retained in the published results.
Whole-tray leak checking with a dedicated fixture
Because the component was an open shallow tray, the project used a dedicated cover fixture with a silicone perimeter seal to close the upper opening. The recorded test covered the complete tray boundary, including corner welds and the drain connection, rather than a single locally sealed weld.
The project condition was 0.2 MPa, held for 30 seconds, with the sealed assembly immersed for bubble observation. No bubbles were recorded in the 50-piece sample from the 200-piece trial batch. The inspection distinguished leakage at the temporary cover seal from leakage through the tray joints.
This is a report of the project’s controlled factory test, not a pressure-test procedure or a product working-pressure rating. Fixture design and safe test operation remain the responsibility of qualified personnel. The leak-check record was dated September 20, 2026.
Residual-liquid acceptance
Ten trays were assessed at a 3° drain orientation. Remaining liquid was collected and weighed for conversion to volume. The recorded values were 0.8–1.2 mL; 1.2 mL was the highest result among the ten pieces, not their average.
All ten results were below the drawing’s ≤5 mL residual-liquid limit. The record was dated September 22, 2026. These results apply to that sample and test condition, not every possible process fluid or equipment installation.
| Inspection | Requirement / condition | Recorded result | Coverage |
|---|---|---|---|
| Mounting and drain dimensions | Hole position ±0.5 mm; DN15 interface | Ø5.2 mm holes; position deviation 0.1–0.3 mm; internal thread clear | First 20 full-dimensional checks; remaining 180 under AQL sampling, five per batch |
| Whole-tray leakage | Dedicated sealed-cover fixture; 0.2 MPa; 30 seconds; immersion observation | No bubbles recorded; fixture seal distinguished from tray joints | 50 sampled pieces from a 200-piece trial batch |
| Residual liquid | 3° drain orientation; drawing limit ≤5 mL | 0.8–1.2 mL; maximum 1.2 mL | 10 sampled pieces from the trial batch |
What the completed assembly changed
The revised assembly combined accessible corner transitions, a low-point drain and a grate that could be removed for cleaning. First-article fit aligned with the equipment piping, while the recorded dimensional, leak and residual-liquid results supported their respective acceptance tasks.
For another OEM program, the useful lesson is to release these interfaces and checks together. DRAmetal’s custom stainless steel drip trays can be reviewed against the customer’s drawings, fluid exposure, mounting arrangement and inspection requirements. The RFQ input guide and drainage acceptance guide explain what to include before quotation.