An AI data-center equipment customer needed to improve the cabinet and pump-support assembly inside a liquid-cooling CDU. The project covered the cabinet frame, pump mounting tray, catch pan and sensor mounting positions, rather than treating the cabinet skin as an isolated fabricated part.
The customer reported excessive pump vibration associated with leakage at pipe joints, a catch pan without a liquid-level sensor interface, frame deformation during lifting and misalignment between the pump support and its base. These issues connected structural stiffness, mounting position and maintenance-related interfaces.
DRAmetal revised the metalwork and assembly references. The project recorded 60% lower pump operating vibration, lifting deformation of 0.5–0.8 mm, and running vibration of 1.2–1.8 mm/s. The catch pan retained a full water fill for 24 hours without leakage, the sensor triggered normally, and the CDU integrated commissioning test passed. The test and inspection coverage is set out below.
Materials and manufacturing route
The project used three specified material and thickness combinations:
- 2.0 mm 304 stainless steel for the cabinet frame.
- 2.5 mm Q235 steel for the pump mounting tray.
- 1.5 mm 304 stainless steel for the catch pan.
Keeping these specifications separate mattered because the frame, load-carrying tray and liquid-retaining pan had different functions. A single cabinet-level material note would not adequately describe the assembly.
Recorded route: Laser cutting → bending → welding → stress relief → powder coating / passivation → catch-pan welding → pump-tray machining → sealing test → assembly inspection.
The material split also made the component drawings important to production planning: the stainless frame and collection pan had to be distinguished from the Q235 pump carrier throughout fabrication and finishing. For a repeat order, those material identities and the applicable finishing instructions belong on the released component documents, alongside the assembly revision.
Pump-support reinforcement and common installation datums
The pump carrier received vibration-isolation pads and reinforcing ribs. The pump and cabinet also used shared installation datums to address the reported mismatch at the base.
This combined change treated support stiffness and installed position together. Reinforcement addressed the support structure, while common datums addressed the relationship between the pump carrier and cabinet. Dimensional acceptance included both the pump mounting-hole positions and cabinet interface flatness, making the assembled interfaces central to the inspection plan.
The project requirement was pump mounting-hole position ≤0.15 mm and cabinet interface flatness ≤0.2 mm/m. Recorded results were position 0.08–0.12 mm and flatness 0.1–0.18 mm/m. The inspection coverage was first-article full inspection plus two pieces sampled per batch.
The overall assembly result also recorded pump alignment deviation ≤0.2 mm. Alignment and hole position describe different characteristics: the former concerns the installed assembly, while the latter controls the mounting interface. Keeping both in the acceptance record helps an OEM assess the fabricated parts and their assembled relationship separately.
Frame bracing and the first-article lifting check
The cabinet frame received an additional lifting crossbeam and diagonal braces to address the deformation observed in the original arrangement. The project requirement limited deformation during the specified full-load lifting validation to ≤1 mm.
The recorded result was 0.5–0.8 mm lifting deformation. The supplied inspection plan assigns the lifting and vibration checks to the first article. It does not describe a lifting test on every production cabinet.
This lifting result applies to the tested cabinet configuration. A frame for another CDU needs a handling review against its own equipment mass, centre of gravity, attachment arrangement and support conditions. Similar cabinet dimensions alone are not enough to transfer the acceptance result to a new design.
Catch-pan sensor interface, drain and water-fill acceptance
The revised stainless catch pan incorporated a liquid-level sensor mounting interface and a drain outlet. This addressed the missing sensor provision while keeping collection, sensing and drainage as identifiable parts of the assembly.
The project required no leakage during a 24-hour full-water test, together with correct sensor installation. The recorded outcome was no leakage after 24 hours and normal sensor triggering. The stated production coverage was 100% water-fill testing.
The pan and sensor formed a coordinated collection interface: liquid retention was checked by the full-water test, and normal triggering confirmed the sensor response in this assembly. Coolant-circuit pressure acceptance remains a separate system requirement from testing a collection pan.
Inspection and test results
The table separates requirements from recorded results and preserves the supplied coverage. On a small screen, scroll horizontally to view every column.
| Inspection item | Project requirement | Recorded result | Recorded coverage |
|---|---|---|---|
| Pump mounting-hole position | ≤0.15 mm | 0.08–0.12 mm | First-article full inspection; two pieces per batch |
| Cabinet interface flatness | ≤0.2 mm/m | 0.1–0.18 mm/m | First-article full inspection; two pieces per batch |
| Lifting deformation | ≤1 mm in the specified full-load check | 0.5–0.8 mm | First-article lifting test |
| Pump operating vibration | ≤2.5 mm/s | 1.2–1.8 mm/s | First-article vibration test |
| Catch-pan sealing | Full water fill for 24 hours without leakage | No leakage after 24 hours | 100% water-fill testing |
| Sensor interface | Correct sensor installation | Normal triggering recorded | Sensor acceptance recorded with the pan test information |
First-article running vibration measured 1.2–1.8 mm/s, below the project’s 2.5 mm/s acceptance limit. The project also recorded 60% lower pump vibration following the support changes. These results describe this pump, mounting arrangement and cabinet configuration; they are not a vibration rating for every CDU frame.
Project outcome and relevance to OEM procurement
The revised assembly met the alignment objective, reduced pump vibration, controlled frame deformation in the first-article lifting check and added a functioning sensor-ready collection pan. The CDU integrated commissioning test passed for this project configuration. Together, the changes resolved connected mechanical-interface issues that could not be addressed by reviewing the cabinet panels alone.
For another OEM program, the practical starting point is a coordinated interface package: cabinet datums, selected pump geometry, isolator references, pipe-support arrangement, service envelope, handling states and pan test requirements. CDU sheet metal enclosures and frames can then be quoted as a defined mechanical supply.
The CDU RFQ scope guide explains how to separate that metalwork from the full cooling system. For detailed interface reviews, see serviceable pump trays and drip trays with leak-sensor mounts.