Pass-Through Cabinet Metalwork: Wall Fit, Door Gaps and Liner Corners — component reference
Component reference image
2.0 ±0.2 mm Door gap / five units
Ra ≤0.8 μm Finished weld surface
3 units Wall-fit trial
R10 Internal corner design

Project Overview

Application The metal shell, liner, two-door hinge seats, wall flange and sealing faces for a cleanroom pass-through cabinet; the customer installed doors and interlock components.
Materials 1.2 mm SUS304 outer shell and 1.0 mm SUS304 liner.
Fabrication route Cutting, bending, welding, R10 internal transitions, flange fabrication, weld blending, brushing and defined surface / fit inspection.
Customer Challenge Difficult-to-clean sharp internal corners, uneven gaps from misaligned hinge seats and a wall flange that did not match the intended opening.
Design changes Rounded liner transitions, hinge locations established with the actual doors, and a wall flange with project-defined adjustment allowance.

A clean-equipment customer needed a pass-through cabinet body that would fit the wall opening, support consistent two-door alignment and provide accessible internal surfaces. The previous arrangement combined sharp liner corners, mismatched hinge seats and a flange interface that required installation adjustment.

DRAmetal revised the metalwork around the wall and door interfaces. The project recorded 2.0 ±0.2 mm door gaps on five units, finished corner-weld surfaces of Ra ≤0.8 μm on five units, and successful wall fitting on three units. The customer supplied and installed the doors and interlock components.

Defining the metalwork package

The supply scope covered the outer shell, inner liner, hinge mounting seats, wall flange and door sealing faces. The outer shell used 1.2 mm SUS304, while the liner used 1.0 mm SUS304.

The hospital or pharmaceutical installation location is not disclosed. The case concerns the fabricated cabinet package and its reported acceptance, not a claim that the metal shell alone establishes a cleanroom class or sterilization performance.

This distinction also keeps the assembly responsibility clear. Door alignment was reviewed using the actual customer configuration, while the installed interlock and complete equipment validation remained part of the customer’s system.

Correcting corners and hinge relationships

The revised liner used R10 internal corner transitions instead of the previous sharp junctions. The fabrication route included cutting, bending, welding, flange welding, weld blending, brushing and inspection of the specified surfaces.

Hinge seats were located with the actual doors so the acceptance review addressed the assembled gap, not just isolated mounting-hole dimensions. A wall flange with defined adjustment allowance was coordinated with the intended opening.

These changes addressed connected interfaces. A consistent liner alone would not correct a misaligned hinge seat, and aligned doors would not solve a mismatched wall flange. The release therefore treated the cabinet as a metal assembly with several separate fit tasks.

Five-unit door-gap inspection

The door record was dated September 5, 2026. Five units from the first batch were checked with feeler gauges at the four sides of the doors. The recorded gap was 2.0 ±0.2 mm.

The reported result applies to the reviewed customer door arrangement. It is not a general manufacturing tolerance for every pass-through cabinet geometry. Another project would need its own hinge hardware, door construction, seal stack and gap requirements.

The four-side review was important because one acceptable gap does not show whether the door is evenly positioned in the opening. The case retains the measured interface and sample rather than reducing it to an undefined statement that the doors were acceptable.

Liner and corner-weld surface acceptance

Also on September 5, 2026, five first-batch units received the recorded surface review. Profilometer and visual inspection covered the polished corner-weld areas, with Ra ≤0.8 μm reported for those finished surfaces.

The customer reported that its cleaning review found no inaccessible corners in the revised arrangement. That observation belongs to this cabinet and the customer’s review. It does not establish a universal cleaning cycle, microbiological result or suitability for every process chemical.

Surface roughness, visible finishing condition and access for cleaning are related but distinct. The published record keeps them separate so the numerical surface result is not mistaken for complete equipment hygiene validation.

Three-unit wall installation check

On September 8, 2026, three units from the first batch were trial-fitted to the actual wall opening. The customer reported uniform surrounding clearance and installation without enlarging the mounting holes. No numerical wall clearance was supplied.

The wall-fit quantity is therefore three, while the door and surface records cover five units each. The case does not imply that all checks were performed on every delivered unit or that a measured wall-gap value exists where only a fit observation was recorded.

CheckRecorded resultCoverage / methodDate
Door alignmentFour-side gap 2.0 ±0.2 mmFive first-batch units; feeler gaugesSeptember 5, 2026
Corner-weld surfacesRa ≤0.8 μm; accepted finished conditionFive units; profilometer and visual reviewSeptember 5, 2026
Wall installationUniform clearance; no hole enlargementThree units; actual wall fitSeptember 8, 2026

Information for a repeatable cabinet quotation

A useful RFQ connects the wall opening, flange envelope, actual door hardware and internal finish requirements. It should also identify which party supplies the doors, seals and interlock system, and how each mechanical acceptance task will be recorded.

Review cleanroom pass-through cabinet metalwork, the wall-flange interface guide and the mechanical acceptance guide when preparing a comparable OEM package.