Hazardous-Area Cabinet Fabrication

ATEX Control
Cabinets
Built for OEM-Controlled Systems

Custom hazardous-area control-cabinet metalwork for OEM programs referencing ATEX or IECEx requirements. We manufacture cabinet bodies, doors, gland plates, mounting panels and mechanical features to the released drawing; the OEM or notified body owns certification.

✓ Build-to-print scope
✓ Inspection by RFQ
✓ OEM approval boundary
ATEX control cabinets inspected in an industrial sheet metal factory
RFQ Project-defined
RFQ
Example order size
Drawing
Critical dimensions
Plan
Inspection scope
OEM
Final approval
01 / What We Fabricate

Cabinet Fabrication for ATEX Equipment Programs

ATEX projects require mechanical discipline around sealing, cable entry, material selection, door stiffness, gasket compression and documentation. DRAmetal manufactures the sheet metal cabinet package to the OEM's released drawings so the final system can proceed through the customer's hazardous-area certification path.

Hazardous-Area Cabinets

Wall-mount and floor-standing control cabinets for Zone 1/2 gas and Zone 21/22 dust equipment programs.

Gland Plate Control

Cable-entry plates, drill patterns, gasket lands and removable gland plates built to the approved layout.

Sealed Mechanical Interfaces

Doors, hinges, latches, gasket channels, bonding studs and mounting panels fabricated for repeatable assembly.

Certification-Aware Packout

Revision labels, inspection records and protected shipping aligned to the OEM's certification documentation flow.

Our scope: cabinet fabrication for ATEX/IECEx equipment programs

The OEM, notified body or system integrator owns the hazardous-area classification, electrical design, Ex component selection, ATEX/IECEx certification and final compliance. DRAmetal manufactures the sheet metal cabinet and mechanical kit to the released drawings and agreed documentation requirements.

02 / ATEX Cabinet Types

Cabinets and Mechanical Kits for Hazardous-Area Systems

ATEX control-cabinet programs require hazardous-area mechanical fabrication, controlled documentation and a clear boundary between build-to-print cabinet work and equipment certification.

Wall-Mount ATEX Control Cabinets Wall Mount

Wall-Mount ATEX Control Cabinets

Compact cabinets for local control, junction, instrument and automation systems in hazardous-area equipment packages.

  • Materials 316L / coated steel
  • Features Gasketed door, gland plate
  • Use Zone 1/2 systems
Floor-Standing Hazardous-Area Cabinets Floor Standing

Floor-Standing Hazardous-Area Cabinets

Larger cabinet bodies and frames for PLC, power distribution, VFD and process-control equipment packages.

  • Format Single or multi-bay
  • Control Door and frame stiffness
  • Finish Powder coat / stainless
Gland Plates and Cable Entry Panels Cable Entry

Gland Plates and Cable Entry Panels

Removable gland plates, bottom entry panels, sealing lands and bonding provisions made to OEM-controlled equipment layouts.

  • Features Cutouts, studs, gaskets
  • Inspection Hole and flatness check
  • Records Revision controlled
ATEX Cabinet Mechanical Kits Cabinet Kits

ATEX Cabinet Mechanical Kits

Cabinet shells, inner panels, doors, brackets, gland plates and hardware packed by project revision for OEM final assembly.

  • Scope Mechanical package
  • Packout Project revision
  • Boundary OEM certification
03 / Technical Capabilities

Typical ATEX Control Cabinet Fabrication Specification

Materials 316L stainless steel, 304 stainless steel, aluminum or powder-coated carbon steel according to the OEM-controlled design
Typical construction Wall-mount cabinets, floor-standing cabinets, inner panels, gland plates, doors, brackets and mounting frames
Processes Laser cutting, CNC punching, bending, welding, grinding, hardware insertion, gasket channel forming, coating and assembly
Hazardous-area details Gland plate layout, bonding studs, gasket compression surfaces, hinge/latch fit, cable-entry panels and door stiffness
Quality controls First article, hole-pattern inspection, flatness review, coating thickness check, gasket land inspection and revision packout
Documentation Material and inspection records aligned to the OEM's drawing, project revision and certification boundary
04 / Manufacturing Process

From Certification Boundary Review to Cabinet Packout

01

Scope Boundary Review

Confirm which cabinet features are controlled by the OEM's ATEX/IECEx requirements and which are standard mechanical details.

02

Material and Sealing Plan

Review stainless or coated steel route, gasket lands, gland plates, bonding points and coating requirements.

03

Cabinet Fabrication

Cut, bend, weld and finish the cabinet shell, door, inner panels, brackets and cable-entry parts.

04

Interface Inspection

Check gasket surfaces, gland plate holes, door fit, hinge/latch alignment and mounting-panel geometry.

05

Finish and Hardware

Apply coating or stainless finishing, install specified hardware and verify project-specific mechanical features.

06

Revision Packout

Pack cabinets and mechanical kits by project, serial range and drawing revision for OEM integration.

05 / Why It Matters

Why ATEX Control Cabinets Need Dedicated Mechanical Control

In a hazardous-area system, the cabinet body is not a generic box. Mechanical deviations can affect sealing, cable entry, bonding, specified component fit and inspection records.

Gland Plate Accuracy

Cable-entry layouts need controlled hole patterns, flatness and gasket surfaces.

Door and Gasket Fit

Door stiffness, hinge alignment and latch pressure affect repeatable sealing.

Certification Boundary

Drawing revisions and controlled changes must remain visible because the OEM's certification path depends on them.

Material and Finish

Stainless grade, coating thickness and corrosion protection must match the operating zone and project specification.

Customer Project

Robot Safety Control Cabinet: Circuit Layout and Access

Materials, fabrication decisions and results for an anonymous customer project.

Robot Safety Control Cabinet: Circuit Layout and Access — component reference

Component reference image

The Customer Challenge

Inadequate enclosure protection and disordered safety wiring accompanied slow emergency-stop response.

Project Measurements & Details

≤100 msEmergency-stop response
IP54Protection test
PLdReported safety level

Results apply to the project configuration described on the linked page.

Read the Customer Project →
07 / Why Choose Us

Why OEMs Use DRAmetal for ATEX Cabinet Fabrication

01

Certification-aware DFM

We identify which mechanical features are sensitive to ATEX/IECEx documentation before production starts.

02

Cabinet and panel capability

Cabinet shells, doors, inner panels, gland plates, brackets and hardware can be managed under one program.

03

Interface-focused inspection

Gasket lands, cable-entry plates, hinge/latch fit and grounding provisions are checked against the released drawing.

04

Project packout

Finished cabinets can be packed by project revision, serial range and installation sequence.

09 / FAQ

ATEX Control Cabinets FAQ

Does DRAmetal certify ATEX control cabinets?

DRAmetal manufactures the cabinet and mechanical parts to the OEM's released drawings. The OEM, integrator or notified body owns ATEX/IECEx certification and final hazardous-area compliance.

What cabinet features can you fabricate?

We fabricate cabinet shells, doors, frames, gland plates, inner panels, mounting brackets, gasket channels, bonding studs and project-specific mechanical kits.

Can you support stainless ATEX cabinet programs?

Yes. 304 and 316L stainless are available, along with powder-coated carbon steel or aluminum when specified by the OEM-controlled design. DRAmetal does not certify the cabinet.

Can cabinets be packed by project revision?

Yes. Finished cabinets and parts can be grouped by project, serial range, drawing revision and installation sequence.

Get Started

Need ATEX Control Cabinets
Built to Your Controlled Design?

Send your cabinet drawings, hazardous-area design boundary, material, gland plate layout, gasket requirements, finish specification and batch quantity. We will review fabrication and documentation risks before quoting.