AI Data Centers · Liquid Cooling · OEM Metalwork

CDU Sheet Metal
Enclosures & Frames
Built Around Your System

Custom cabinet frames, reinforced pump carriers, stainless catch pans and service panels for liquid-cooling equipment OEMs. Send your released drawings, equipment interfaces and inspection requirements for a defined fabrication quote. Prepare a CDU metalwork RFQ · Data-center fabrication capabilities

✓ Build-to-print scope
✓ Inspection by RFQ
✓ OEM approval boundary
CDU sheet metal cabinet structure with a reinforced pump carrier and stainless catch pan
RFQ Project-defined
RFQ
Example order size
Drawing
Critical dimensions
Plan
Inspection scope
OEM
Final approval
01 / What We Fabricate

A Mechanical Supply Package for Your CDU Program

DRAmetal fabricates the cabinet and supporting metal assemblies around an OEM's released CDU layout. Define the frame, pump supports, collection pan, pipe brackets and access panels as separate BOM items, then coordinate their finished-state relationships for pilot builds and repeat production.

Equipment OEMs

Cabinet and subassembly fabrication for liquid-cooling equipment manufacturers with a defined system layout, component population and drawing release.

Pump-Support Assemblies

Reinforced carriers and mounting structures coordinated with the selected pump geometry, isolators, pipe supports and assembly datums.

Collection and Sensor Interfaces

Stainless catch pans with specified welded seams, drain connections and sensor mounting features, tested to an agreed project procedure.

Repeat Production Kits

Panels, supports and installed hardware supplied to identified revisions, with agreed dimensional reports and first-article or batch acceptance records.

Quote the Metalwork. Identify the System Responsibilities.

State explicitly whether pumps, fluid circuits, controls, thermal validation and final commissioning are supplied by the OEM, another partner or a separately agreed package. A cabinet quote should identify those interfaces before manufacture.

02 / Mechanical Configurations

Cabinets, Pump Carriers, Catch Pans and Bulkheads

Select the fabricated assemblies your program requires. These are custom scopes for OEM equipment, not stocked complete cooling systems or interchangeable housings for every CDU.

Cabinet Frames and Access Panels Structural frame

Cabinet Frames and Access Panels

Folded and welded structures with braces, mounting rails, feet and removable service panels. Release the populated load cases and mating references before setting the structural acceptance criteria.

  • Structure Released drawing
  • Access Service envelope
  • Handling Approved state
Reinforced Pump Trays Equipment support

Reinforced Pump Trays

Steel pump carriers with ribs, mounting pads and selected isolation-hardware interfaces. Coordinate the pump mounting pattern with the cabinet base and independent pipe supports.

  • Pump Selected geometry
  • Alignment Common datums
  • Isolators Specified hardware
Stainless Drip Trays Liquid collection

Stainless Drip Trays

Welded catch pans with defined collection geometry, sensor brackets and drain interfaces. Identify the fill level, duration, medium and production coverage for pan acceptance.

  • Basin Drawing-defined
  • Sensor Released interface
  • Testing Agreed procedure
Bulkheads and Pipe Supports Removable interfaces

Bulkheads and Pipe Supports

Replaceable penetration plates, clamp brackets and crossmembers that separate pipe clearance from structural restraint. Include installation order and service-tool access.

  • Openings Finished clearance
  • Supports Load inputs
  • Panels Removal sequence
03 / Technical Capabilities

Define the Project Before Defining the Acceptance Limits

Supply scope Cabinet structures, pump carriers, catch pans, panels, supports and expressly included hardware or assembly operations.
Materials Stainless steel and carbon steel selected by drawing; the related customer project used 304 stainless steel and Q235 steel.
Thickness and construction Released per component after review of formability, joining, support loads and inspection access; no single thickness is assigned to an entire CDU.
Critical interfaces Pump mounting patterns, frame datums, cabinet mating faces, pipe supports, panel clearances and sensor mounting positions.
Surface condition Specified coating or stainless finishing route, with masking and final mating-surface condition identified on the drawing.
Dimensional acceptance Drawing-specific tolerances and an agreed first-article / batch sampling plan; mating fixtures or trial assembly where specified.
Catch-pan testing Project-defined water-fill or other agreed sealing procedure, with the test article, duration and coverage recorded.
Handling review Dry, populated, filled, maintenance and shipping conditions defined by the responsible project team before approval.
RFQ inputs CAD and drawings, controlled BOM, mating component references, quantities, finish schedule, load inputs and requested inspection records.
04 / Manufacturing Process

From Interface Review to Repeatable Metalwork

01

Scope the Mechanical BOM

Separate fabricated components, purchased hardware and customer-supplied equipment. Record the installation and acceptance owner for each assembly.

02

Review Datums and Access

Coordinate pump and frame references, pipe clearances, sensor positions, service openings and the approved handling arrangement.

03

Release the Fabrication Route

Plan cutting, forming, joining, reinforcement, hardware installation and any required secondary operations against the released component drawings.

04

Control the Finished State

Apply the selected surface-treatment route and preserve specified mating pads, threads and bonding interfaces. Inspect critical relationships after the relevant operations.

05

Check the Agreed Configuration

Complete the specified dimensional inspection, fit verification and pan test. Keep first-article tests distinct from batch sampling or tests on every item.

06

Release and Retain Revisions

Close approved deviations, record the accepted configuration and confirm packaging interfaces. Repeat orders reference the same controlled drawing and BOM set.

05 / Why It Matters

Interfaces That Decide Whether the Cabinet Assembles

The external enclosure shape is only one part of the procurement decision. Review the populated mechanical relationships before ordering repeat quantities.

Pump and Pipe Alignment

Common references help coordinate pump mounts, frame supports and piping interfaces. Avoid using assembly force to hide unresolved positional differences.

Service Access

A removable cover must clear the selected pump, fittings, connectors and tools in the agreed maintenance sequence.

Collection and Sensing

The catch pan, drain and sensor mount need separate geometry and acceptance requirements. Mechanical fit and sensor function are related but different checks.

Frame Handling States

Population, fluid condition, centre of gravity and support arrangement belong in the project's handling assessment, not in a generic cabinet rating.

Customer Project

Liquid-Cooling CDU Frame and Pump Tray: Vibration, Alignment and Leak Collection

Materials, fabrication decisions and results for an anonymous customer project.

Liquid-Cooling CDU Frame and Pump Tray: Vibration, Alignment and Leak Collection — component reference

Component reference image

The Customer Challenge

Pump vibration associated with pipe-joint leakage, no liquid-level sensor mount in the catch pan, frame deformation during lifting and pump-to-base misalignment.

Project Measurements & Details

60%Reported pump vibration reduction
0.5–0.8 mmFirst-article lifting deformation
1.2–1.8 mm/sRecorded running vibration

Results apply to the project configuration described on the linked page.

Read the Customer Project →
07 / Why Choose Us

Source the Metalwork with Clear Engineering Inputs

01

Defined Quotation Scope

Receive a quote against released metalwork, selected hardware and stated assumptions, so mechanical supply is not confused with complete CDU performance.

02

Coordinated Assemblies

Review frames, pump supports, pans and panels as an interacting mechanical package instead of accepting isolated dimensions without mating context.

03

Project-Specific Inspection

Agree the report content, test condition and inspection coverage that matter to the selected equipment rather than applying unsupported blanket tolerances.

04

Controlled Repeat Orders

Keep revisions, approved substitutions, finish requirements and packaging details aligned as the OEM program moves from pilot quantities into repeat supply.

09 / FAQ

CDU Cabinet and Frame Fabrication Questions

Do you supply an entire coolant distribution unit?

This page covers fabricated cabinet structures and the mechanical assemblies expressly included in a quotation. Identify the owners of pumps, fluid circuits, controls, thermal performance and final commissioning in the RFQ; do not assume they are included in an enclosure order.

Can the scope include a pump tray and a stainless catch pan?

Yes. These can be quoted with the frame, access panels and specified brackets. Provide the selected pump interfaces, isolator details, pan drawing, sensor reference and drain requirements so each component has a defined acceptance condition.

Which materials and thicknesses should an OEM specify?

Specify each component according to its function and released design. Our related CDU project used a 2.0 mm 304 stainless frame, 2.5 mm Q235 pump carrier and 1.5 mm 304 catch pan. Those are project choices, not universal recommendations for every CDU.

Can you inspect pump mounting positions and cabinet interfaces?

Define the required datums, tolerance limits, inspection condition and coverage with the drawings. The quotation can then identify first-article reporting, batch sampling and any requested mating-fixture or trial-assembly checks.

Does a catch-pan test prove the whole cooling system is leak-tight?

No. A pan test establishes its result under the specified fill condition. Fluid-circuit pressure testing, sensor logic and system commissioning require their own procedures and responsibilities.

What should we send for a fabrication quote?

Send CAD and released drawings, the mechanical BOM, mating equipment references, quantities, finish requirements, service and handling conditions, and the inspection or test records you require. Mark unresolved interfaces so quotation assumptions can be reviewed.

Get Started

Ready to Source Your
CDU Metalwork Package?

Share your cabinet, pump-support and catch-pan drawings with the equipment interfaces, quantities and required records. Our team will review the defined fabrication scope.

Certification documents are available for supplier qualification. Mention the required standard and project scope in your inquiry.