Equipment OEMs
Cabinet and subassembly fabrication for liquid-cooling equipment manufacturers with a defined system layout, component population and drawing release.
Custom cabinet frames, reinforced pump carriers, stainless catch pans and service panels for liquid-cooling equipment OEMs. Send your released drawings, equipment interfaces and inspection requirements for a defined fabrication quote. Prepare a CDU metalwork RFQ · Data-center fabrication capabilities
DRAmetal fabricates the cabinet and supporting metal assemblies around an OEM's released CDU layout. Define the frame, pump supports, collection pan, pipe brackets and access panels as separate BOM items, then coordinate their finished-state relationships for pilot builds and repeat production.
Cabinet and subassembly fabrication for liquid-cooling equipment manufacturers with a defined system layout, component population and drawing release.
Reinforced carriers and mounting structures coordinated with the selected pump geometry, isolators, pipe supports and assembly datums.
Stainless catch pans with specified welded seams, drain connections and sensor mounting features, tested to an agreed project procedure.
Panels, supports and installed hardware supplied to identified revisions, with agreed dimensional reports and first-article or batch acceptance records.
State explicitly whether pumps, fluid circuits, controls, thermal validation and final commissioning are supplied by the OEM, another partner or a separately agreed package. A cabinet quote should identify those interfaces before manufacture.
Select the fabricated assemblies your program requires. These are custom scopes for OEM equipment, not stocked complete cooling systems or interchangeable housings for every CDU.
Structural frame Folded and welded structures with braces, mounting rails, feet and removable service panels. Release the populated load cases and mating references before setting the structural acceptance criteria.
Equipment support Steel pump carriers with ribs, mounting pads and selected isolation-hardware interfaces. Coordinate the pump mounting pattern with the cabinet base and independent pipe supports.
Liquid collection Welded catch pans with defined collection geometry, sensor brackets and drain interfaces. Identify the fill level, duration, medium and production coverage for pan acceptance.
Removable interfaces Replaceable penetration plates, clamp brackets and crossmembers that separate pipe clearance from structural restraint. Include installation order and service-tool access.
| Supply scope | Cabinet structures, pump carriers, catch pans, panels, supports and expressly included hardware or assembly operations. |
|---|---|
| Materials | Stainless steel and carbon steel selected by drawing; the related customer project used 304 stainless steel and Q235 steel. |
| Thickness and construction | Released per component after review of formability, joining, support loads and inspection access; no single thickness is assigned to an entire CDU. |
| Critical interfaces | Pump mounting patterns, frame datums, cabinet mating faces, pipe supports, panel clearances and sensor mounting positions. |
| Surface condition | Specified coating or stainless finishing route, with masking and final mating-surface condition identified on the drawing. |
| Dimensional acceptance | Drawing-specific tolerances and an agreed first-article / batch sampling plan; mating fixtures or trial assembly where specified. |
| Catch-pan testing | Project-defined water-fill or other agreed sealing procedure, with the test article, duration and coverage recorded. |
| Handling review | Dry, populated, filled, maintenance and shipping conditions defined by the responsible project team before approval. |
| RFQ inputs | CAD and drawings, controlled BOM, mating component references, quantities, finish schedule, load inputs and requested inspection records. |
Separate fabricated components, purchased hardware and customer-supplied equipment. Record the installation and acceptance owner for each assembly.
Coordinate pump and frame references, pipe clearances, sensor positions, service openings and the approved handling arrangement.
Plan cutting, forming, joining, reinforcement, hardware installation and any required secondary operations against the released component drawings.
Apply the selected surface-treatment route and preserve specified mating pads, threads and bonding interfaces. Inspect critical relationships after the relevant operations.
Complete the specified dimensional inspection, fit verification and pan test. Keep first-article tests distinct from batch sampling or tests on every item.
Close approved deviations, record the accepted configuration and confirm packaging interfaces. Repeat orders reference the same controlled drawing and BOM set.
The external enclosure shape is only one part of the procurement decision. Review the populated mechanical relationships before ordering repeat quantities.
Common references help coordinate pump mounts, frame supports and piping interfaces. Avoid using assembly force to hide unresolved positional differences.
A removable cover must clear the selected pump, fittings, connectors and tools in the agreed maintenance sequence.
The catch pan, drain and sensor mount need separate geometry and acceptance requirements. Mechanical fit and sensor function are related but different checks.
Population, fluid condition, centre of gravity and support arrangement belong in the project's handling assessment, not in a generic cabinet rating.
Materials, fabrication decisions and results for an anonymous customer project.

Component reference image
Pump vibration associated with pipe-joint leakage, no liquid-level sensor mount in the catch pan, frame deformation during lifting and pump-to-base misalignment.
Results apply to the project configuration described on the linked page.
Read the Customer Project →Receive a quote against released metalwork, selected hardware and stated assumptions, so mechanical supply is not confused with complete CDU performance.
Review frames, pump supports, pans and panels as an interacting mechanical package instead of accepting isolated dimensions without mating context.
Agree the report content, test condition and inspection coverage that matter to the selected equipment rather than applying unsupported blanket tolerances.
Keep revisions, approved substitutions, finish requirements and packaging details aligned as the OEM program moves from pilot quantities into repeat supply.
This page covers fabricated cabinet structures and the mechanical assemblies expressly included in a quotation. Identify the owners of pumps, fluid circuits, controls, thermal performance and final commissioning in the RFQ; do not assume they are included in an enclosure order.
Yes. These can be quoted with the frame, access panels and specified brackets. Provide the selected pump interfaces, isolator details, pan drawing, sensor reference and drain requirements so each component has a defined acceptance condition.
Specify each component according to its function and released design. Our related CDU project used a 2.0 mm 304 stainless frame, 2.5 mm Q235 pump carrier and 1.5 mm 304 catch pan. Those are project choices, not universal recommendations for every CDU.
Define the required datums, tolerance limits, inspection condition and coverage with the drawings. The quotation can then identify first-article reporting, batch sampling and any requested mating-fixture or trial-assembly checks.
No. A pan test establishes its result under the specified fill condition. Fluid-circuit pressure testing, sensor logic and system commissioning require their own procedures and responsibilities.
Send CAD and released drawings, the mechanical BOM, mating equipment references, quantities, finish requirements, service and handling conditions, and the inspection or test records you require. Mark unresolved interfaces so quotation assumptions can be reviewed.
Share your cabinet, pump-support and catch-pan drawings with the equipment interfaces, quantities and required records. Our team will review the defined fabrication scope.
Certification documents are available for supplier qualification. Mention the required standard and project scope in your inquiry.