Drawing-led component supply
List the shell, liner, doors, seals, hardware and bought-in items, with responsibility for each.
Order stainless shells, liners, door-interface parts and wall flanges for an OEM pass-through cabinet. DRAmetal coordinates the drawing-defined metal package with your wall opening, door hardware, cleaning requirements and assembly plan. Related fabrication family · Customer project and inspection scope
A pass-through cabinet body must fit both the building interface and the selected equipment components. We fabricate the specified metalwork, with the door, seal, interlock, ventilation and other bought-in items identified in the agreed BOM. Complete cleanroom, sterilization and system performance remain project-specific validation tasks.
List the shell, liner, doors, seals, hardware and bought-in items, with responsibility for each.
Opening dimensions, wall thickness, installation datums, flange envelope and permitted adjustment.
Agree the finished-part dimensions and actual mating components before the trial, with the method and quantity recorded for each acceptance task.
Separate prototype, pilot and repeat-order demand, with approved revisions, kit content and surface protection carried into the supply plan.
List the shell, liner, doors, seals, hardware and bought-in items, with responsibility for each. Opening dimensions, wall thickness, installation datums, flange envelope and permitted adjustment. Actual door geometry, hinge and strike hardware, seal stack and opening path.
The options below describe fabrication scope. Dimensions, material, hardware and acceptance conditions are agreed for the individual drawing and BOM.
Cabinet Shell Coordinated outer shells and internal liners with specified corner construction, finish and assembly references.
Wall-Flange Assemblies Metal mounting flanges matched to the actual wall opening, thickness and approved installation allowance.
Two-Door Interface Hinge seats, strike provisions and sealing faces reviewed around the selected door assemblies.
Liner details Internal supports and shelf interfaces released with the cabinet's cleaning access, corner geometry and agreed loading requirements.
| Supply boundary | List the shell, liner, doors, seals, hardware and bought-in items, with responsibility for each. |
|---|---|
| Wall interface | Opening dimensions, wall thickness, installation datums, flange envelope and permitted adjustment. |
| Door package | Actual door geometry, hinge and strike hardware, seal stack and opening path. |
| Internal surfaces | Corner construction, weld blending, finish requirements and measurement locations. |
| Interlock provisions | Selected component outlines, mounts, cable access and the customer's validation boundary. |
| Environment | Cleaning agents and exposure conditions used by the equipment designer to select materials and finishes. |
| Acceptance | Dimensional, door-fit, surface and installation checks with separate sample quantities. |
| Order planning | Trial units, recurring demand, protection of finished surfaces and required records. |
Confirm the metal package and responsibilities for doors, seals and system components.
Cut and form the released stainless geometry around the mounting and internal interfaces.
Join the specified seams and flange features while controlling the released relationships.
Blend and finish defined regions, retaining the agreed surface acceptance requirements.
Use selected mating components or references for the contracted fit checks.
Identify the assembly revision and protect liners, flanges and door-contact surfaces in transit.
Review these interfaces before accepting an overall envelope or material label as a complete purchasing specification.
The cabinet must work with the wall opening and both access sides, not only the outer dimensions.
Hinges, strikes, seals and the door itself determine the assembled gap and closure behavior.
Corner geometry and finishing should be reviewed against the customer's cleaning operation.
Metal brackets for an interlock do not establish the complete interlock's safety or functional approval.
Materials, fabrication decisions and results for an anonymous customer project.

Component reference image
Difficult-to-clean sharp internal corners, uneven gaps from misaligned hinge seats and a wall flange that did not match the intended opening.
Results apply to the project configuration described on the linked page.
Read the Customer Project →Review the mating components, unresolved interfaces and acceptance requirements before they become manufacturing assumptions.
Define the fabricated parts and bought-in components in one controlled supply BOM, with clear assembly responsibility.
Request the dimensional report, first-article trial and other project documentation at quotation, with explicit sample coverage.
Retain approved drawings, component identities, finish references and packaging rules for recurring business orders.
The page describes custom metalwork. Specify all doors, seals, interlock parts and other components in the RFQ so the complete supply and integration responsibility can be agreed.
Provide the actual opening, wall thickness, surrounding clearance and installation datums. A custom flange and trial-fit requirement can then be reviewed.
Yes, where included in the released design. Define the required geometry, weld blend and surface inspection; corner radius alone does not establish cleaning performance.
Release the selected doors, hinges, strikes and sealing arrangement, then specify the measurement locations and assembly sample. The linked customer project used a four-side gap check.
No rating is inferred from the metal body or finish. The complete configured equipment and its intended process need the applicable validation.
Send metal drawings, wall and door interfaces, the BOM, finish and exposure requirements, trial quantities, repeat demand and required acceptance records.
Share the controlled drawings, mating interfaces, material and finish, quantities and acceptance requirements for an engineering quotation.
For supplier qualification, specify the required standard and project scope. Confirm the applicable certificate holder, manufacturing site and document coverage before order placement.