Medical & Clean Equipment OEMs

Cleanroom Pass-Through
Cabinet Metalwork
Built Around Your Released Interfaces

Order stainless shells, liners, door-interface parts and wall flanges for an OEM pass-through cabinet. DRAmetal coordinates the drawing-defined metal package with your wall opening, door hardware, cleaning requirements and assembly plan. Related fabrication family · Customer project and inspection scope

✓ Build-to-print scope
✓ Inspection by RFQ
✓ OEM approval boundary
Cleanroom Pass-Through Cabinet Metalwork with defined OEM mounting and assembly interfaces
RFQ Project-defined
RFQ
Example order size
Drawing
Critical dimensions
Plan
Inspection scope
OEM
Final approval
01 / What We Fabricate

Cleanroom Pass-Through Cabinet Metalwork for Equipment Purchasing Teams

A pass-through cabinet body must fit both the building interface and the selected equipment components. We fabricate the specified metalwork, with the door, seal, interlock, ventilation and other bought-in items identified in the agreed BOM. Complete cleanroom, sterilization and system performance remain project-specific validation tasks.

Drawing-led component supply

List the shell, liner, doors, seals, hardware and bought-in items, with responsibility for each.

Defined material and hardware

Opening dimensions, wall thickness, installation datums, flange envelope and permitted adjustment.

First-article acceptance

Agree the finished-part dimensions and actual mating components before the trial, with the method and quantity recorded for each acceptance task.

Business batch purchasing

Separate prototype, pilot and repeat-order demand, with approved revisions, kit content and surface protection carried into the supply plan.

Send the Drawing and Its Mating Components

List the shell, liner, doors, seals, hardware and bought-in items, with responsibility for each. Opening dimensions, wall thickness, installation datums, flange envelope and permitted adjustment. Actual door geometry, hinge and strike hardware, seal stack and opening path.

02 / 01 / Product Configurations

Choose the Metalwork Configuration

The options below describe fabrication scope. Dimensions, material, hardware and acceptance conditions are agreed for the individual drawing and BOM.

Cabinet Shell and Liner Sets Cabinet Shell

Cabinet Shell and Liner Sets

Coordinated outer shells and internal liners with specified corner construction, finish and assembly references.

  • Material Released stainless grade
  • Corners Defined transitions and welds
  • Surface Agreed inspection locations
Wall-Flange Assemblies Wall-Flange Assemblies

Wall-Flange Assemblies

Metal mounting flanges matched to the actual wall opening, thickness and approved installation allowance.

  • Wall Opening / thickness inputs
  • Mounting Released pattern and datums
  • Check Installation trial scope
Two-Door Interface Metalwork Two-Door Interface

Two-Door Interface Metalwork

Hinge seats, strike provisions and sealing faces reviewed around the selected door assemblies.

  • Hardware Exact hinge / strike BOM
  • Alignment Four-side gap requirement
  • Seal Approved contact arrangement
Internal Shelf and Liner Features Liner details

Internal Shelf and Liner Features

Internal supports and shelf interfaces released with the cabinet's cleaning access, corner geometry and agreed loading requirements.

  • Shelf Released span and support
  • Access Cleaning / removal sequence
  • Surface Defined finish inspection
03 / Technical Capabilities

RFQ Inputs and Supply Scope

Supply boundary List the shell, liner, doors, seals, hardware and bought-in items, with responsibility for each.
Wall interface Opening dimensions, wall thickness, installation datums, flange envelope and permitted adjustment.
Door package Actual door geometry, hinge and strike hardware, seal stack and opening path.
Internal surfaces Corner construction, weld blending, finish requirements and measurement locations.
Interlock provisions Selected component outlines, mounts, cable access and the customer's validation boundary.
Environment Cleaning agents and exposure conditions used by the equipment designer to select materials and finishes.
Acceptance Dimensional, door-fit, surface and installation checks with separate sample quantities.
Order planning Trial units, recurring demand, protection of finished surfaces and required records.
04 / Manufacturing Process

From Interface Review to Controlled Batch Supply

01

Scope review

Confirm the metal package and responsibilities for doors, seals and system components.

02

Shell and liner forming

Cut and form the released stainless geometry around the mounting and internal interfaces.

03

Welding and flange assembly

Join the specified seams and flange features while controlling the released relationships.

04

Surface finishing

Blend and finish defined regions, retaining the agreed surface acceptance requirements.

05

Door and wall review

Use selected mating components or references for the contracted fit checks.

06

Protected delivery

Identify the assembly revision and protect liners, flanges and door-contact surfaces in transit.

05 / Why It Matters

Resolve the Details That Control Assembly

Review these interfaces before accepting an overall envelope or material label as a complete purchasing specification.

Two-sided installation

The cabinet must work with the wall opening and both access sides, not only the outer dimensions.

Door stack

Hinges, strikes, seals and the door itself determine the assembled gap and closure behavior.

Accessible corners

Corner geometry and finishing should be reviewed against the customer's cleaning operation.

System scope

Metal brackets for an interlock do not establish the complete interlock's safety or functional approval.

Customer Project

Pass-Through Cabinet Metalwork: Wall Fit, Door Gaps and Liner Corners

Materials, fabrication decisions and results for an anonymous customer project.

Pass-Through Cabinet Metalwork: Wall Fit, Door Gaps and Liner Corners — component reference

Component reference image

The Customer Challenge

Difficult-to-clean sharp internal corners, uneven gaps from misaligned hinge seats and a wall flange that did not match the intended opening.

Project Measurements & Details

2.0 ±0.2 mmDoor gap / five units
Ra ≤0.8 μmFinished weld surface
3 unitsWall-fit trial

Results apply to the project configuration described on the linked page.

Read the Customer Project →
07 / Why Choose Us

A Fabrication Partner for OEM Programs

01

Application-focused drawing review

Review the mating components, unresolved interfaces and acceptance requirements before they become manufacturing assumptions.

02

Coordinated metalwork and hardware

Define the fabricated parts and bought-in components in one controlled supply BOM, with clear assembly responsibility.

03

Scope-specific quality records

Request the dimensional report, first-article trial and other project documentation at quotation, with explicit sample coverage.

04

Repeat-order configuration control

Retain approved drawings, component identities, finish references and packaging rules for recurring business orders.

09 / FAQ

OEM Purchasing Questions

Is this a complete cleanroom pass-box supply?

The page describes custom metalwork. Specify all doors, seals, interlock parts and other components in the RFQ so the complete supply and integration responsibility can be agreed.

Can the cabinet fit our existing wall opening?

Provide the actual opening, wall thickness, surrounding clearance and installation datums. A custom flange and trial-fit requirement can then be reviewed.

Can you provide rounded internal corners?

Yes, where included in the released design. Define the required geometry, weld blend and surface inspection; corner radius alone does not establish cleaning performance.

How are door gaps controlled?

Release the selected doors, hinges, strikes and sealing arrangement, then specify the measurement locations and assembly sample. The linked customer project used a four-side gap check.

Does the metalwork establish a cleanroom or sterilization rating?

No rating is inferred from the metal body or finish. The complete configured equipment and its intended process need the applicable validation.

What should a business buyer send?

Send metal drawings, wall and door interfaces, the BOM, finish and exposure requirements, trial quantities, repeat demand and required acceptance records.

Get Started

Source Your Next
Cleanroom Pass-Through Cabinet Metalwork

Share the controlled drawings, mating interfaces, material and finish, quantities and acceptance requirements for an engineering quotation.

For supplier qualification, specify the required standard and project scope. Confirm the applicable certificate holder, manufacturing site and document coverage before order placement.