Process-side liners
Solid or segmented inner skins follow the approved material, surface, seam and local exposure requirements. Folded returns, mounting features and penetrations are coordinated with the equipment assembly.
DRAmetal manufactures industrial oven liners, outer skins, insulation retainers and access or airflow panels. Customer-specified insulation assembly can be included. We coordinate materials, overlaps, thermal-movement interfaces, openings and inspection around the approved wall design, with local temperature and atmosphere reviewed for each supplied layer. Define the wall assembly scope · Order and first-article approvals
A liner, an outer cover and an assembled insulated wall are different deliverables. Define the layers and delivery state in the quotation so every supplied part has a clear role and acceptance boundary. Heating systems, controls and whole-oven thermal or safety validation are separate from acceptance of the fabricated metalwork.
Solid or segmented inner skins follow the approved material, surface, seam and local exposure requirements. Folded returns, mounting features and penetrations are coordinated with the equipment assembly.
External panels close the wall assembly and provide defined maintenance or connection access. Finish, support points and removable fasteners follow each surface's exposure and function.
Retaining strips, support clips and plates locate customer-specified insulation. Coverage, attachment and removal routes follow the wall section and installation sequence.
Insulation can be assembled to the approved BOM and installation instructions. Identify product, thickness, layering, coverage, retention, supply responsibility and checks before closing the cavity.
The section shows which metal face contacts the process, where insulation is retained and which interfaces move or open. Add zone schedules and component withdrawal envelopes to make the fabrication scope visible.
Choose each fabricated layer around its role in the wall assembly. The approved design connects material, local exposure, movement, insulation and complete-equipment validation requirements.
Process Side Cut and formed liner skins with specified return flanges, overlaps, mounting features and surface condition. Segmentation and fixed or floating references follow the released wall layout.
External Metalwork External covers with defined fastening, finish and connection openings. Coordinate installation order and underlying assembly access before releasing the panel geometry.
Insulation Interface Fabricated retaining plates and clips, with insulation installation when agreed. The selected insulation and equipment design define the layering and installation condition.
Functional Openings Perforated distribution panels, baffles and detachable covers around released openings and support geometry. System airflow and temperature verification follow the equipment test plan.
| Assembly boundary | Provide wall sections, part and assembly drawings, revisions, quantities and BOM. Identify loose skins, subassemblies, insulation, seals, hardware and customer-supplied components. |
|---|---|
| Material and exposure | Specify exact grade, material standard, thickness and condition for each part. Our published fabrication materials include 304, 316 and 316L stainless steel, and carbon steel such as SPCC. Select each grade for its actual layer, metal temperature, atmosphere, cleaning and mechanical duty; these grades are not interchangeable hot-side approvals. |
| Movement and support | Identify fixed references, floating interfaces, cold assembly position, temperature inputs and restraints. Define slot geometry and the complete fastening stack rather than an unspecified expansion allowance. |
| Seams and surfaces | Define overlap direction, joint geometry, approved seals, welding, edge treatment and finish by surface. Distinguish dimensional fit from any required leakage or thermal test. |
| Insulation installation | Name the approved product, thickness, layers, joints, retention and installation instructions. Identify who supplies it, substitution approvals and checks before the wall closes. |
| Openings and access | Supply selected heater, fan and probe interfaces, support references and withdrawal envelopes. Include insulation collars, outer covers and tool access in the coordinated assembly. |
| Perforated panels | Specify hole size, pitch, pattern, open regions, solid borders and orientation. Air-distribution design and whole-oven uniformity validation require separately defined conditions. |
| Inspection and delivery | Agree material identity, critical dimensions, supports and restraint during measurement, assembly checks, sample coverage and records. Identify panel location and revision through packout. |
Connect each part to its layer, zone and role. Confirm supplied materials, local conditions and acceptance boundaries before quotation.
Review bend access, joint orientation, slots and component clearances. Resolve changes through the approved drawing revision.
Cut, form and weld the selected parts while preserving material identity and references. Control shape in the drawing's specified inspection condition.
Apply the specified treatment and fit agreed retainers, insulation and hardware. Record selected concealed features before closing skins.
Inspect critical features and specified remove-and-refit operations with identified samples and setup. Equipment-level thermal tests remain separately defined.
Follow customer first-article approval requirements. Protect thin panels and mating edges while preserving zone, orientation and part identity through packout.
An oven panel is accepted as part of a defined installation. These reviews connect fabrication to the equipment around it.
The fastener stack, overlap and adjacent attachments determine whether intended movement remains available. Define what locates the panel and what moves.
Coverage and retention become hidden behind the outer skin. Agree in-process checks while the cavity is accessible.
A heater or probe may fit its cutout but need more room for withdrawal. Coordinate service envelopes with retainers, skins and supports.
Assembly records describe the supplied parts and checked configuration. Airflow, heat loss, uniformity and complete-equipment safety follow the equipment validation plan.
Keep skins, retaining parts and agreed insulation on a common assembly boundary so quotations cover the same delivery state.
Plan folds, welding and finishing around mounting, seam and service interfaces the installed panel must preserve.
State free or mounted measurement, identify restraints and samples, and record the actual assembly operations accepted.
Retain material, zone, orientation and revision in the supplied kit so replacements do not depend on appearance or undocumented matching.
Yes. Retaining metalwork and customer-specified insulation assembly can be included when the quotation defines the approved product, BOM, wall section, instructions and inspection scope. Identify whether material is customer supplied or procured to the approved specification. Thermal performance and complete-oven validation need their own agreed conditions.
Select the grade and product specification from local metal temperature, atmosphere, cleaning and mechanical duty. Stainless steel, carbon steel and other project-selected materials are reviewed for the actual part. Fabrication availability is not a universal hot-side approval or temperature rating.
Provide panel and support materials, lengths, cold assembly condition, temperature inputs, fixed references and permitted movement. The fastener stack and adjacent overlaps must preserve that movement; slots alone do not define a floating joint.
No. We manufacture the released pattern, borders and mounting interfaces. Air distribution and temperature uniformity depend on the completed equipment and loading configuration and follow the responsible equipment builder's test plan.
State functional regions and whether measurement is free or mounted. Define supports, restraint, fastening condition and limits. This distinguishes fabrication shape from changes imposed by a fixture or frame.
Yes, to the agreed drawings and assembly scope. Include heater, fan or probe interfaces, supports, seals or sleeves, fastening and withdrawal paths. Identify bought-in parts and separate electrical or equipment validation responsibilities.
New customers, new products, changed orders and individual orders of 100 pieces or more require customer first-article approval. An order below 20 pieces or an unchanged repeat order does not create an automatic exemption. Skipping approval requires an existing valid written waiver arrangement or a written waiver from the customer's authorized representative for the applicable part, revision and order, confirmed by our internal quality lead.
Send wall sections, liner and cover drawings, material and insulation BOM, quantities, exposure inputs and inspection requirements for a coordinated fabrication quotation.
Certification documents are available for supplier qualification. Mention the required standard and project scope in your inquiry.