Shells and removable covers
Formed and, where specified, welded bodies with separate covers. Define the cover opening direction, fastening arrangement and space needed to remove a populated lid.
A compact control station needs more than a row of holes. DRAmetal fabricates empty sheet-metal boxes and removable covers around the selected buttons, indicators, contact blocks and installation space. Order the metalwork, defined mechanical hardware and agreed fit checks as one controlled package; electrical components and wiring remain separately identified. Looking for a display or console housing? · What to include in a button-box RFQ
This product family covers compact wall-mounted or machine-mounted boxes without a display. The enclosure design begins with actual operator drawings: the front bezel, mounting collar, anti-rotation detail and rear contact-block arrangement. A nominal button size is not enough to release the metalwork. For larger screens, pedestals or consoles, use our HMI enclosure range instead.
Formed and, where specified, welded bodies with separate covers. Define the cover opening direction, fastening arrangement and space needed to remove a populated lid.
Hole patterns and anti-rotation features made to the selected component's mounting requirements, with labels, collars and internal modules included in the layout review.
Wall ears, machine-side brackets and drawing-defined entry holes or plates. Review access for the selected mounting screws, glands and locknuts in the installed position.
Specified threaded hardware, cover fixings, seal interfaces and approved masks. Identify which seals, glands or other bought-in parts are included, supplied loose or customer-supplied.
Include the selected buttons, selectors and indicators—not only their nominal diameter. The complete front-and-rear assembly helps resolve cover thickness, spacing and box depth before metal is cut.
These configurations describe build-to-print metalwork, not an off-the-shelf compatibility list. Component drawings and the released assembly determine each opening, surface and supplied item.
Compact Station Small empty housings for a selected operator or indicator, with the depth and access checked against its complete rear assembly.
Array Layout Covers with coordinated button, selector and indicator arrays. Rear-module spacing and front-label clearances are resolved together.
Material Choice Stainless shells and lids with the required surface finish, edge treatment and seal-contact geometry. Any environmental testing is separately agreed for the specified finished assembly.
Installed Fit Enclosures with external ears or separate mounting brackets, keeping cover removal and cable installation accessible after the box is fixed to the equipment.
| Operator identities | Manufacturer, complete part number, mounting drawing and rear contact/illumination configuration for every occupied opening. Identify permitted substitutes explicitly. |
|---|---|
| Panel and cutout | Finished panel thickness, cutout geometry, anti-rotation features, coordinate datums, collar and label clearances. Do not substitute a nominal series name for a dimensioned drawing. |
| Internal envelope | Contact-block depth and width, cable approach, gland/locknut space, approved routing and the cover's removal path. Electrical clearance requirements come from the responsible designer. |
| Material and finish | Steel, stainless steel or aluminum grade and thickness; coating or surface treatment; cosmetic faces; mask boundaries; finished-state fit requirements. |
| Cover and sealing interfaces | Selected seal, cover fasteners, contact lands and any retention arrangement. Specify the proposed inspection and separate environmental test scope for the configured assembly. |
| Installed mounting | Machine or wall interface, mounting-hole layout, surrounding obstructions, screw access and cable-entry orientation. Include drawings of any mating brackets. |
| Supply and inspection | Prototype or batch quantity, metal-only or mechanical-hardware scope, customer-supplied parts, critical dimensions, sample quantity and the reference components used for fit checks. |
| Variant and packout control | Box/cover pairings, component alternatives, approved marking artwork, drawing revision, loose hardware and the identification needed at the customer's assembly station. |
Check the face layout against the actual collars, labels and populated contact-block assembly. Resolve missing dimensions before the cutting pattern is released.
Coordinate depth, entry direction, mounting ears and cover removal. Separate the mechanical envelope from electrical-design decisions that require the OEM's approval.
Manufacture the shell, lid and brackets to the approved drawings. Keep functional hole patterns and cover lands tied to the specified datums through forming and joining.
Apply the agreed coating or surface treatment, protecting defined threads and contact areas. Inspect dimensions in the finished condition wherever that controls assembly.
Inspect critical features and trial-fit specified reference components or an approved fixture. Record which configuration and sample were checked; mechanical fit is not a functional-safety test.
Release approved corrections into the drawings and BOM. Match cover patterns, hardware and markings at packout so a later batch can be assembled without guessing its configuration.
The outside dimensions can be correct while the operator nut, a rear contact block or a service cable still has nowhere to go. Review these relationships early.
Operators from different series can share a nominal mounting size while needing different anti-rotation details, panel thicknesses or rear space. Alternatives need their own compatibility review.
A removable lid may carry the operators and their connections. Agree a mechanical removal path and any cover-retention provision without assuming the wiring can support the lid.
Define whether a hole or clamping dimension applies before or after finishing. Keep cosmetic touch-up, masking and seal contact requirements explicit rather than modifying a completed part informally.
An empty housing, a gasket or a separately rated button does not establish the rating of the assembled control station. Agree who validates the complete enclosure and electrical arrangement.
The quotation identifies the shell, cover, brackets and hardware rather than assuming that a box price includes operators, wiring or certification.
Cutouts, mounting faces and coating masks stay on the same released specification. Critical fit is reviewed in the condition the assembly team receives.
Agree dimensional checks, actual-component trials and any fixture-based checks before production. Report the inspected configuration and sample instead of implying every possible combination was tested.
Different hole arrays and label layouts can be managed as identified parts with approved pairings, making repeat supply easier to reconcile with the customer's BOM.
No. The standard scope here is fabricated metalwork and explicitly agreed mechanical hardware. Buttons, contact blocks, wiring, control functions and final electrical validation must be separately identified. Reference components may be used for agreed mechanical fit checks.
Yes, submit the complete operator part numbers and current mounting drawings, including the selected contact or illumination modules. We review the required cutout, panel thickness, clamping arrangement and rear envelope. A nominal diameter alone does not establish compatibility.
A common shell can be reviewed with separately identified covers when their mounting, internal and service interfaces remain compatible. Each approved cover, operator configuration and marking version needs a defined pairing in the BOM.
Include the selected seal, cover stack and mounting interface in the RFQ. Supply scope can include drawing-defined ears, brackets and agreed mechanical hardware. Sealing inspection and any formal ingress test are separately specified for the configured assembly.
No. Material selection and component approvals do not automatically qualify the assembled station. The responsible OEM or integrator defines the required environmental and electrical validation for the actual configuration.
Send the shell and cover drawings, operator references, internal layout, mounting and cable-entry details, material and finish, quantity, supplied-parts list and required inspection. Identify unresolved dimensions or alternatives so they can be reviewed before production release.
Send your box and operator drawings, quantity, finish and assembly requirements for a quotation on the defined metalwork package.
Certification documents are available for supplier qualification. Mention the required standard and project scope in your inquiry.