Equipment OEMs · Control-Panel Builders · Integrators

Custom Sheet Metal
Wireways
Covers, Elbows & Interfaces That Fit

Source enclosed cable-routing metalwork to your equipment drawings. DRAmetal coordinates straight troughs, removable covers, elbows, joining plates and specified hardware as a configured OEM supply package—not a generic length of channel. Open cable tray alternatives · Customer wireway project

✓ Build-to-print scope
✓ Inspection by RFQ
✓ OEM approval boundary
Powder-coated metal wireway straight sections, removable cover and fabricated elbow on an industrial bench
RFQ Project-defined
Covers
Finished-state fit
Splices
Aligned routing interfaces
Entries
Selected harness hardware
Kits
Revision-controlled supply
01 / What We Fabricate

Enclosed Routing Components for Equipment Programs

A wireway combines an accessible cover with a defined cable-routing envelope. The metalwork must fit the cabinet or machine, its adjoining sections and the selected harness components. Our scope is fabricated metalwork and agreed hardware; the OEM defines conductor selection, electrical design, installation rules and complete-system acceptance.

Straight sections and covers

Release the section profile, length, cover overlap, fastening pattern and usable internal envelope together. Cover removal needs clearance in the installed equipment.

Elbows and connecting parts

Coordinate straight-to-bend interfaces using identified ends, splice plates and fasteners. Joint inspection should address both gap and offset.

Dividers and entry provisions

Build specified internal partitions and cable-entry openings around approved harness layouts, grommets or glands. Do not infer electrical segregation from a divider alone.

Configured production kits

Separate each section, cover and fitting on the BOM. Agree first-article scope, packing supports, protective finishes and repeat-order revision control.

Send the Routing Layout, Not Only the Cross-Section

Include the equipment interface, segment BOM, cover attachment, entry hardware and the planned first-article assembly. If electrical ratings or bonding tests are required, state the applicable specification and responsible approval party explicitly.

02 / 01 / Wireway Configurations

Choose the Fabricated Routing Package

Configurations are made to the agreed drawing, material and equipment interface. The images show component forms; exact geometry and hardware are project-specific.

Straight Troughs & Removable Covers Straight Runs

Straight Troughs & Removable Covers

Formed metal bodies and matching lids with controlled cover overlap, attachment points and finished clearances.

  • Profile Released width / depth
  • Cover Defined retention method
  • Check Finished assembly fit
Elbows & Direction Changes Route Changes

Elbows & Direction Changes

Fabricated bend sections coordinated with adjacent runs, connecting hardware and the available installation envelope.

  • Route Drawing-defined angle
  • Ends Identified mating interfaces
  • Check Joint gap and offset
Divided Wireway Metalwork Internal Layout

Divided Wireway Metalwork

Longitudinal dividers, local mounting tabs and supporting details to the OEM's released internal routing layout.

  • Partitions Defined height and fixing
  • Space Harness envelope reviewed
  • Scope OEM electrical design
Pre-Cut Entry Configurations Cable Entries

Pre-Cut Entry Configurations

Entry openings and hardware provisions matched to selected harness exits, protective grommets or gland components.

  • Openings Identified hole map
  • Protection Selected edge hardware
  • Check Actual component trial fit
03 / Technical Capabilities

RFQ Inputs That Define the Supplied Wireway

Drawing and route Segment IDs, section lengths, cross-sections, bend angles, mating-end references and the equipment routing envelope.
Material and finish Specified steel, stainless or aluminum grade and thickness; coating system, masking, appearance and finished fit requirements.
Cover attachment Overlap, screws or selected retention hardware, permitted gap and access for installation and later removal.
Joints and supports Splice pattern, intended adjustment, brackets, host mounting holes and customer-defined loading / support conditions.
Cable entries Entry positions, actual connector and harness envelopes, grommet or gland identities, edge condition and trial-fit requirements.
Internal dividers Partition geometry, fastening, changes through bends and the OEM's electrical segregation requirements.
Inspection coverage First-article configuration, sampled dimensions, coating checks, trial assembly and any separately specified bonding checks.
Order and packing Prototype / pilot / repeat quantities, component BOM, match marks, long-section protection and destination handling constraints.
04 / Manufacturing Process

From Route Drawing to a Repeatable Metalwork Kit

01

Review the complete route

Resolve adjoining sections, cover-removal paths, harness exits and host mounting references before making individual blanks.

02

Cut and form the parts

Produce profiles, openings, return lips and bend segments using the released material and geometry.

03

Coordinate joins and hardware

Check splice alignment, selected fasteners, divider mounting and accessible tightening positions.

04

Finish in the delivery state

Apply the specified finish with edge treatment and masking. Recheck interfaces affected by coating build.

05

Inspect and trial assemble

Record the agreed dimensional sample and trial assembly. Identify required corrections rather than treating a drawing as proof of fit.

06

Protect and identify the kit

Pack long runs against edge damage and bending, with covers and connectors identified to their released positions.

05 / Why It Matters

Details That Decide Whether the Route Assembles

A correct section width alone does not establish a workable routing system. Include the interfaces below in the engineering review.

Clearances after finish

Cover lips, screw seats and nested joints must fit in the coated condition. Allocate the coating build rather than accepting only bare-part fit.

Splice alignment through elbows

Use common mating-end references. Check accumulated orientation and offset across a representative assembly, not just each piece separately.

Entry-hole compatibility

Use selected grommets, glands and actual harness envelopes. An opening that passes the connector can still leave an unacceptable cable-contact edge.

Packaging and change closure

Record transport damage, corrective work and reinspection separately. Carry accepted entry-hole changes into the drawing before the next production release.

Customer Project

Metal Wireway: Cover Fit, Splice Alignment and Entry Corrections

Materials, fabrication decisions and results for an anonymous customer project.

Metal Wireway: Cover Fit, Splice Alignment and Entry Corrections — component reference

Component reference image

The Customer Challenge

An OEM metal wireway project combining coated cover fit, six-piece dimensional sampling, splice checks and corrections at two of eight cable entries.

Project Measurements & Details

6 piecesDimensional sample
0.3–0.6 mmRecorded splice gaps
0.2–0.3 mmCover clearance after coating

Results apply to the project configuration described on the linked page.

Read the Customer Project →
07 / Why Choose Us

A Precision Fabrication Partner for OEM Routing Hardware

01

One coordinated component package

Review bodies, covers, fittings and hardware together so purchasing is based on an installable BOM rather than unrelated metal blanks.

02

Finished-state interface control

Identify the dimensions and contact surfaces that affect fit after bending, joining and finishing, with project-specific acceptance.

03

Defined inspection records

Request the sample quantities, trial-fit configuration and record requirements at quotation. Keep dimensional, coating and electrical checks distinct.

04

Repeat-order revision control

Capture approved corrections, variant IDs and packing requirements before recurring orders, including changes discovered during customer installation.

09 / FAQ

OEM Wireway Purchasing Questions

How does this differ from a cable tray?

This page covers enclosed metal routing sections with accessible covers, elbows and connecting parts. Cable trays principally provide open support. The equipment engineer should select the appropriate arrangement and applicable installation requirements.

Do you supply standard retail lengths or complete electrical installations?

Our focus is custom metalwork and configured batches for equipment OEMs, cabinet builders and integrators. Define any purchased hardware separately; conductor design and complete installation acceptance remain in the agreed OEM project scope.

Can the route include dividers and pre-cut entries?

Yes. Provide the divider layout, selected entry hardware, harness envelope and equipment interfaces. The drawing must define electrical separation requirements and the metalwork features needed to implement them.

Should cover fit be checked before or after coating?

Specify acceptance in the delivered condition. Bare-part checks help control fabrication, but coating build can alter lips, overlaps and fastener fit. Include a finished-state trial where these interfaces are critical.

Does the metal wireway automatically have a stated IP, NEMA or bonding rating?

Ratings and electrical acceptance are configuration-specific. Share the required specification and test scope at quotation so the applicable materials, joints, hardware and documentation can be reviewed. A dimensional check alone does not establish an electrical or environmental rating.

Can project measurements be used as general product tolerances?

No. The linked customer's sample results apply to that project and its recorded checks. Your drawing, size, material, finish and inspection requirements define acceptance for a new order.

What should be included in a repeat-order release?

Use the approved route and BOM, including accepted entry-hole corrections, cover and splice revisions, inspection scope and packing method. Close outstanding drawing changes before authorizing another batch.

Get Started

Build Your Next
OEM Wireway Package

Share the route drawing, section BOM, entry hardware, material and finish, order quantities and acceptance requirements for an engineering quotation.

For supplier qualification, specify the required standard and project scope. Confirm the applicable certificate holder, manufacturing site and document coverage before order placement.