Medical & laboratory equipment
Catch trays beneath tubing connections, sample-handling zones and serviceable assemblies, with fluid exposure and cleaning requirements supplied by the equipment owner.
Source fabricated catch trays with controlled mounting interfaces, low-point drains and removable grates. DRAmetal reviews your drawings, process-fluid exposure, batch quantities and acceptance requirements before quotation. Sheet metal boxes & trays · Laboratory tray customer case
An equipment drip tray needs to fit the mounting structure, collect liquid from the intended area and remain accessible for cleaning. We fabricate tray bodies and related sheet-metal components to released OEM requirements, coordinating the drain outlet, welded boundary, grate supports and finished-state inspection.
Catch trays beneath tubing connections, sample-handling zones and serviceable assemblies, with fluid exposure and cleaning requirements supplied by the equipment owner.
Order the body alone or include removable perforated grates, support ledges, clips and specified connection components under a defined bill of materials.
Release mounting holes, locating faces, drain connection standards and the installed orientation together so fabrication and first-article review address the same assembly.
Part numbers, revision control, agreed sampling and protective packaging support repeat OEM purchasing without assuming that all tray designs share one acceptance limit.
Include the equipment envelope, drain standard, supported loads, liquid exposure and acceptance plan. Prototype and repeat-batch quantities should be listed separately.
These configurations describe fabrication options. Dimensions, grade, thickness, load capacity and acceptance conditions are agreed for the individual drawing.
Drainage Formed tray bodies with continuous liquid-boundary welds and a drain entrance positioned relative to the installed low point.
Cleaning access Perforated support surfaces with defined spans, edge finishing and retention so cleaning access is considered with the supported load.
Installation Compact pans with mounting ears, flanges or brackets coordinated with equipment datums and drain-connection access.
Maintenance Trays designed around an OEM-defined withdrawal path, with connection and grate access reviewed before the envelope is released.
| Drawing package | 2D drawing and 3D model, revision, mating assembly and controlled datums. |
|---|---|
| Material | Stainless grade and thickness selected against the customer's fluid, temperature and cleaning exposure; alternatives require review. |
| Body geometry | Overall envelope, corner construction, wall height, slope reference and usable containment boundary. |
| Drain connection | Outlet location, thread or connector standard, sealing arrangement and access for assembly. Nominal size alone is insufficient. |
| Removable grate | Perforation layout, supported item footprint, span, load condition, retention and edge acceptance. |
| Weld and finish | Liquid-boundary welds, blend requirements, texture, measurement locations and specified post-fabrication treatment. |
| Inspection | First-article dimensions, agreed production sampling, leak method and drainage acceptance reported separately. |
| Order planning | Prototype and trial quantities, repeat-batch demand, delivery configuration, surface protection and required records. |
Confirm the installed envelope, mounting datums, connection standard, fluid exposure and open technical questions.
Prepare the sheet geometry and formed features around the approved drawing, bend sequence and accessible weld joints.
Join the liquid-boundary seams and specified drain connection, with distortion and mating relationships considered.
Complete the agreed weld blend and surface route, then check grate seating, retention and accessible handling edges.
Perform the contracted dimensional and functional checks with separate sample quantities and traceable project records.
Protect finished surfaces and connections for shipment and retain the released configuration for subsequent batches.
A tray quotation is most useful when it describes the finished assembly. Review these interfaces before a thickness or overall size becomes the only purchasing requirement.
Relate the drain entrance to the formed floor and installed orientation. Define the residual-liquid test condition if it is part of acceptance.
Support rails and retention features should be reviewed for both mechanical duty and the customer's intended cleaning sequence.
Show the mating pipe or hose, tool access and withdrawal path; a tray that fits the machine may still be difficult to remove.
Dimensional fit, leak checking, usable volume and grate loading are different acceptance tasks, not interchangeable evidence.
Materials, fabrication decisions and results for an anonymous customer project.

Component reference image
Hard-to-clean square corner joints, residual liquid near an offset drain and a welded-in grate that prevented removal for cleaning.
Results apply to the project configuration described on the linked page.
Read the Customer Project →We discuss the tray's equipment interfaces and unresolved inputs before turning assumptions into a production scope.
Tray bodies, grates and mounting parts can be reviewed as a controlled kit with defined bought-in connection components.
Request the dimensional report, weld or leak-check record and other documentation your purchasing program needs at quotation.
Separate first-article work from recurring inspection and packaging requirements so repeat orders retain the approved configuration.
This service is focused on drawing-led components for equipment manufacturers and business purchasing teams. Share your application, drawings and batch quantities for a custom fabrication review.
Yes. The scope can include a specified drain connection, removable perforated grate, support features and retaining hardware. Provide the mating connection standard, load footprint and service clearances.
Grade selection depends on the process fluid, concentration, temperature and cleaning exposure. Provide those conditions and the approved equipment specification; do not select solely from appearance or an industry label.
Project-specific checks can be reviewed at quotation. Define the method, tested assembly, orientation, acceptance limit and sampling plan. A fixture-based leak test does not create a general working-pressure rating.
No. The linked laboratory case reports its own material, configuration, sample quantities and test conditions. Your design requires its own released requirements and agreed verification scope.
Send controlled tray and grate drawings, mating interfaces, material and finish requirements, fluid exposure, inspection records needed, trial quantities and expected repeat batches. Identify any unresolved inputs for review.
Share the tray and grate drawings, drain details, exposure conditions, quantities and acceptance requirements for an engineering quotation.
Certification documents are available for supplier qualification. Mention the required standard and project scope in your inquiry.