Supply and Return Headers
Welded or machined headers distribute coolant to drawing-defined rack branches while preserving port pitch and service access.
Build-to-print rack manifolds, branch headers, mounting brackets and connection kits for direct liquid cooling deployments. DRAmetal controls the released mechanical assembly from port geometry through leak-test records; the cooling system designer owns flow, pressure and thermal validation.
These assemblies divide supply and return flow at the rack or row interface. The product boundary covers fabricated headers, ports, supports and released connection hardware rather than the complete CDU, controls or facility loop.
Welded or machined headers distribute coolant to drawing-defined rack branches while preserving port pitch and service access.
Brackets, rails and guards locate the manifold against cabinet datums without obstructing cables, doors or service paths.
Released couplings, caps, drain points and identification hardware can be grouped by rack model and deployment revision.
Port position, weld condition, cleanliness and drawing-defined pressure or leak tests are recorded against the assembly identity.
DRAmetal manufactures the released mechanical assembly. The cooling system designer owns fluid compatibility, flow balance, pressure limits, thermal capacity, controls, field flushing and final system validation.
Configuration starts with the rack layout, coolant architecture and service envelope supplied by the OEM or cooling integrator.
Rack Level Supply and return headers mounted along the rear or side of a server rack.
CDU Branch Compact branch assemblies connecting a CDU outlet to multiple rack or row circuits.
Service Bracketed connection panels that position released couplings for repeatable hose access.
Deployment Manifold, brackets, guards and hardware grouped for a specific cabinet and site revision.
| Materials | 304/316L stainless steel, aluminum and copper alloys to released drawings and fluid-compatibility requirements |
|---|---|
| Processes | Tube and header preparation, CNC machining, TIG welding or brazing, bracket fabrication, cleaning, assembly and drawing-defined leak testing |
| Critical interfaces | Port pitch, thread or coupling interface, bracket datum, hose clearance, drain orientation and rack service envelope |
| Quality records | Material identity, weld traveler, dimensional report, cleanliness record and pressure or leak-test result as specified |
| Packout | Protective caps, released fittings, brackets and fasteners grouped by rack, row, site and revision |
| Supply boundary | Fabricated rack distribution assembly; the system owner validates coolant chemistry, flow, pressure, thermal performance, controls and installation |
Confirm rack, CDU and facility responsibilities plus fluid, pressure and cleanliness requirements.
Map every branch centerline, bracket datum, hose route and service clearance.
Review joints, tooling access, distortion risk, cleaning and the released test method.
Prepare headers, ports and brackets with material and revision identity maintained.
Join, clean and test the assembly to the drawing-defined pressure, medium and acceptance criteria.
Verify rack interfaces and group protected components by deployment kit.
A pressure-tight header can still fail installation if port pitch, hose clearance or bracket location is wrong.
Small centerline errors accumulate across multiple branches and load hoses or quick connects.
Joining sequence and fixturing protect bracket and port datums after welding.
Debris control and protective caps reduce contamination risk before system flushing.
Supply, return and rack-model variants require unmistakable part and kit identification.
Materials, fabrication decisions and results for an anonymous customer project.

Component reference image
Pipe vibration fatigued supports, joints leaked, and enclosure interference restricted maintenance access.
Results apply to the project configuration described on the linked page.
Read the Customer Project →Headers, ports, brackets and guards can be coordinated under one released assembly.
Functional rack and port datums drive first-article and repeat checks.
Specified leak tests can be tied to assembly identity and revision.
Protected manifolds and hardware are grouped by rack, row and site.
It is the rack-level supply and return distribution assembly between the upstream cooling loop and server branches. It usually includes headers, ports, brackets and connection hardware.
Yes. We manufacture build-to-print headers and rack kits using drawing-defined materials, ports, joining methods, cleanliness controls and tests.
No. The system designer specifies flow, pressure drop, coolant and thermal requirements; we manufacture and inspect the released hardware.
Testing can follow a released pressure, medium, hold time and acceptance criterion. The exact method must be defined on the drawing or quality plan.
Send drawings, 3D models, rack datums, port and fitting specifications, materials, joining requirements, cleanliness level, test method, variants and quantities.
Send rack and manifold drawings, port specifications, materials, tests, cleanliness requirements, variants and quantities for DFM review.