Free buyer template

Custom Sheet Metal Enclosure RFQ Template

Give every bidder the same technical and commercial input. This editable template covers drawings, material, enclosure performance, fabrication, finish, inspection records, packaging, price breaks, and delivery scope.

Electrical & controls enclosures Washdown & outdoor cabinets Prototype to repeat production Comparable supplier quotations
Use boundary: this template helps define an RFQ. It does not assign an IP, NEMA, UL, or other certification to a design or supplier. Required standards, verification, listed components, and documentation must be agreed for the specific project.
Complete input package

Six RFQ sections that prevent hidden assumptions

A low unit price is not comparable when one supplier priced material records, inspection, packaging, and delivery while another did not. Send a controlled input set and require bidders to list assumptions and exclusions.

01

Files and document control

  • Buyer part number, part name, and released revision
  • Controlling 2D drawing and 3D model formats
  • Critical-to-quality balloons and general tolerance source
  • Prototype, production, and annual quantity assumptions
02

Material and fabrication

  • Exact alloy or grade, temper or condition, and thickness
  • Substitution policy and required material records
  • Bend, weld, hardware, door, hinge, latch, and gasket details
  • Threads, inserts, grounding points, and coating-sensitive features
03

Environment and performance

  • Indoor, outdoor, washdown, coastal, chemical, or cleanroom exposure
  • Required IP, NEMA, or project-specific verification scope
  • Heat load, cooling method, airflow, and ambient range
  • EMI, bonding, flammability, vibration, and service-access requirements
04

Finish and appearance

  • Pretreatment, final finish, color code, texture, and gloss
  • Coating thickness, masking, grounding, and gasket lands
  • Cosmetic zones, viewing conditions, and approved samples
  • Marking, artwork, barcode, serial number, and label durability
05

Inspection and records

  • First article, sampling, and 100 percent characteristics
  • Ballooned report, material, coating, weld, and photo records
  • Required gauges, CMM, fixtures, or measurement-method approval
  • Nonconformance notification and deviation approval route
06

Commercial and logistics

  • Tooling or NRE ownership and price-break structure
  • Packaging, labeling, pallet, and corrosion-protection requirements
  • Delivery country, postal code, Incoterm, and shipment method
  • Requested currency, lead-time breakdown, assumptions, and exclusions
Open stainless steel enclosure showing gasket channel, latches, hardware, and finish sample coupons
USA and Canada sourcing

Fields that commonly change the quotation

Include the controlling unit system, exact material callout, enclosure-rating scope, quality records, and delivered commercial terms. Do not rely on a supplier to infer them from a reference image.

Certification language: requesting a component, material, or process record is not the same as requiring the complete enclosure or supplier to hold a certification. Write the required scope explicitly and obtain written confirmation before order release.
RFQ field What to state Why it matters
Units and tolerancesState whether inch or metric controls. Identify the drawing tolerance standard and every critical exception.Prevents suppliers from pricing different interpretations of the same feature.
Material designationProvide the exact drawing designation and specification rather than a broad term such as stainless or aluminum.Reduces substitution, availability, and certificate ambiguity.
NEMA / IP scopeState the required standard, enclosure type or rating, test boundary, components, and who owns verification.NEMA and IP language should not be treated as an automatic one-to-one equivalence.
Listed componentsIdentify any required listed or recognized components and whether the fabricated enclosure itself requires a separate evaluation.Avoids implying that component status automatically applies to the complete assembly.
Quality recordsList the exact FAI, COC, material, finish, dimensional, and traceability records required with shipment.Allows documentation labor and inspection scope to be included in the quotation.
Delivery scopeProvide destination, Incoterm, duties responsibility, packaging standard, and requested ship mode.Makes supplier quotations commercially comparable.
Quotation normalization

Ask every supplier for the same price breakdown

Separate recurring part price from one-time work and logistics. This makes supplier differences visible before a purchase decision.

A

One-time charges

  • Tooling, fixtures, gauges, and programming
  • Engineering or DFM review when separately priced
  • First article and special documentation
  • Samples, finish coupons, or approval builds
B

Recurring unit price

  • Material, fabrication, purchased hardware, and finish
  • Unit-price breaks at the same quantities
  • Inspection and normal production records
  • Packaging included in the unit price
C

Lead time and delivery

  • Material, tooling, sample, approval, and production stages
  • Ex-works readiness versus delivered date
  • Freight, insurance, duties, and local delivery scope
  • Quotation validity and unresolved assumptions
Before purchase order

RFQ release gate

Check these items before treating a quotation as complete. The downloadable workbook contains the full working list, responsibility fields, controlled status options, and a column for supplier clarifications.

Controlling files are identified

Drawing, model, artwork, finish specification, and revisions match. The controlling document and units are unambiguous.

Technical assumptions are closed

Material substitution, tolerances, rating scope, purchased components, finish, inspection, and documentation have written answers.

Commercial scope is comparable

All bidders used the same quantities, price breaks, packaging, delivery destination, currency, and Incoterm.

Changes require approval

DFM recommendations are documented, but no drawing, material, process, or finish change becomes effective without the buyer’s controlled approval.

Download the editable XLSX workbook at https://drametal.com/downloads/custom-sheet-metal-enclosure-rfq-workbook.xlsx or the simplified CSV at https://drametal.com/downloads/custom-sheet-metal-enclosure-rfq-template.csv.