Door-Seal & Clean-Pack Inspection Records

Two separate enclosure projects, with their tested configuration, inspection coverage and recorded results. Use these records to define what needs checking on your own drawing and order.

Energy-storage equipment · door sealing

Door assembly tested in a sealed fixture

One SUS304 door-and-frame assembly was checked for dust entry and temporary immersion on . The door was mounted on a sealed 600 × 600 × 600 mm test chamber. The purpose was to assess the door sealing system in that configuration, not the complete production cabinet.

Door configuration

  • SUS304 door and frame, 2.5 mm sheet, No.4 brushed finish.
  • Continuous EPDM foam seal; recorded compression of 0.3 mm.
  • Three-point latch with perimeter M5 countersunk screws.
  • No observation window in this test sample.

Fixture interfaces

Two cable glands and one membrane breather valve were fitted to the test chamber wall, not to the door panel. Their positions and interfaces belong to this fixture configuration.

The record therefore does not verify gland or valve openings in a different production door. A window, revised seal, latch, entry layout or cabinet assembly requires its own assessment.

One door assembly in the specified sealed test chamber
CheckRecorded conditionsRecorded result
Dust exposure2 kg/m³ talc, 8 hours, extraction-type test; sample unpowered.No dust observed inside at the inspected door, wiring-space and breather locations.
Temporary immersionLowest point at least 1.0 m below the water surface; 600 mm-high fixture fully submerged for 30 minutes. Water-to-sample temperature difference no greater than 5 K.After drying the exterior and opening the assembly, the interior was dry; no water ingress was recorded.
Separate 316L housing project · delivery condition

Five-piece cleaning and packaging inspection

Five SUS316L No.4-finish housings were sampled on . Cleaning and packing took place at a local clean-handling workstation within an ordinary assembly workshop. Acceptance covered visible surface condition, white-glove wiping, the project's roughness requirement and the protective packaging.

Recorded cleaning sequence

  1. Remove loose chips and dust using oil-free compressed air.
  2. Wipe twice with 99.9% IPA and clean wipes.
  3. Wipe once with deionized water, then dry.
  4. Remove remaining surface dust with the specified dust-removal roller.
  5. Inspect under lighting and perform the white-glove wipe check.

Confirmed packaging layers

  1. Two PE bags: a part-contact layer and a second protective layer.
  2. An aluminum-foil vacuum bag, vacuum packed and heat sealed.
  3. EPE corner and cushioning protection.
  4. A five-ply corrugated outer carton.

Two 5 g silica-gel desiccant packs were included per inspected package. The inspection recorded intact inner heat seals and no new handling scratches.

One recorded Ra result per inspected piece; project acceptance range 0.30–0.60 μm
PieceRecorded Ra (μm)Project criterion
10.41Within range
20.43Within range
30.39Within range
40.40Within range
50.42Within range

Five of five sampled pieces passed the recorded checks. Ra results ranged from 0.39 to 0.43 μm. Visual inspection found no visible oil, fingerprints or particles; the white-glove wipe check found no visible contamination. Packaging checks recorded intact inner seals, two desiccant packs and no new scratches on each sampled piece.

Bring the inspection scope into your supplier review

These are independent project summaries authorized for anonymous publication. Review the configuration, sample coverage and acceptance criteria alongside your released drawing. Company management-system certification, product testing and shipment inspection each answer different procurement questions.