Joint design, process source, fixture strategy, qualification, acceptance criteria and records must be agreed before production.
Welding Routes Considered by RFQ
Candidate processes are reviewed against material, joint, access, quantity, qualification and inspection inputs. The selected source and measurable scope appear in the quotation.
Weldable Materials We Specialize In
Optimized parameters and filler metal selection to establish the required joint behavior and the evidence needed for the released assembly.
Welding Solutions For Global Industries
The examples below are possible application contexts, not evidence of industry qualification or completed customer work.
Weld Quality Control & Documentation
The accepted RFQ defines inspection stages, acceptance criteria, qualified sources and required records. This page does not promise a fixed verification package.
Multi-Stage Weld Verification
1. Pre-Weld Preparation
Material records, joint fit-up, cleaning and WPS review are included only when required by the released project control plan.
2. In-Process Monitoring
Parameter recording, interpass-temperature control and visual checks follow the agreed weld inspection plan when quoted.
3. Post-Weld Inspection
Dimensional, finish or NDT scope such as liquid-penetrant or ultrasonic examination requires a specified method, acceptance criteria and qualified inspection source.
4. Documentation & Traceability
Material traceability, welder-qualification records and inspection reports are supplied only when defined by the accepted RFQ.
Streamlined Project Flow
DFM & Weldability Review
We analyze your drawings for joint design, access, and distortion risks, providing suggestions for cost reduction.
Fixture & WPS Development
Custom fixtures are designed to maintain accuracy, and a WPS is created based on qualified procedures.
First Article (FAI) Approval
A first article is produced, fully inspected, and submitted for your approval before full production begins.
Production & Delivery
Batch production with consistent quality, followed by finishing (powder coating, polishing) and direct shipping to your door.
Welding Controls Defined Before Production
DRAmetal holds ISO 9001, AS9100D, ISO 13485 and IATF 16949 certifications. Certification details are available on request for supplier qualification. Specify any AWS, ISO 3834, EN 15085 or ASME requirements, WPS, personnel qualifications and third-party inspection in the RFQ so the applicable process scope and records can be confirmed before quotation.
ISO 3834-2
Quality Requirements for Fusion Welding
AWS D1.1 / D1.6
Structural & Stainless Steel Welding Code
EN 15085
Railway Applications - Welding of Rolling Stock
ASME IX
Qualification Standard for Welding Procedures
No anonymous customer testimony is presented as evidence. Published examples describe process considerations, not verified customer outcomes.
Confirm material, joint design, WPS requirements, qualification evidence, inspection and acceptance criteria in the RFQ.
Discuss Your Welding Project Today
Send drawings for an RFQ review of weld access, distortion controls, qualifications, inspection requirements and quotation scope.
GET IN TOUCH WITH US